14. Development of 1MW pressurized hydrogen production system to enhance micro-grid utilization
Funding Source: Korea Energy Technology Evaluation and Planning (KETEP)
Period: 2025.7 - 2028.6 (3 years)
Principal Investigator: Prof. Sanghun Lee
13. Development of an integrated Carbon capture and storage (CCS) system for network optimization and safety assurance
Funding Source: Korea Energy Technology Evaluation and Planning (KETEP)
Period: 2025.7 - 2028.12 (3 years 6 months)
Principal Investigator: Prof. Baehyun Min
12. Simulation and geometry optimization of ammonia pre-processor
Funding Source: Korea Institute of Machinery & Materials (KIMM)
Period: 2025.1 - 2027.12 (3 years)
Principal Investigator: Prof. Sanghun Lee
11. Study on establishing evaluation standards for selective catalytic reduction (SCR) equipment to reduce nitrogen oxides (NOx)
Funding Source: Korea Research Institute of Ships and Ocean Engineering (KRISO)
Period: 2025.7 - 2025.12 (0 year 6 months)
Principal Investigator: Prof. Sanghun Lee
10. A study on enhancing the reliability of greenhouse gas emissions from ships by utilizing process simulation of greenhouse gas reduction technologies
Funding Source: Korea Research Institute of Ships and Ocean Engineering (KRISO)
Period: 2024.6 - 2024.11 (0 year 6 months)
Principal Investigator: Prof. Sanghun Lee
9. K-water greenhouse gas emission lifecycle assessment introduction research project
Funding Source: Korea Water Resources Corporation (K-water)
Period: 2023.11 - 2024.11 (1 year)
Principal Investigator: Prof. Sanghun Lee
8. Development of ESG and greenhouse gas emission evaluation system
Funding Source: Hana Financial Group
Period: 2023.10 - 2024.03 (0 year 6 months)
Principal Investigator: Prof. Yongsang Choi (Professor at EWU)
7. Element exploration study for ship greenhouse gas flow simulation
Funding Source: Korea Research Institute of Ships and Ocean Engineering (KRISO)
Period: 2023.10 - 2023.12 (0 year 3 months)
Principal Investigator: Prof. Sanghun Lee
6. Chemical process modeling for hydrogen production through methane reforming
Funding Source: JM International (funded by the research project from Ministry of SMEs and Startups)
Period: 2023.06 - 2023.08 (0 year 3 months)
Principal Investigator: Prof. Sanghun Lee
5. The korean green taxonomy guidelines (K-Taxonomy) application model development project
Funding Source: Yoon&Yang LLC (Lawfirm Hwawoo)
Period: 2022.11 - 2023.04 (0 year 6 months)
Principal Investigator: Prof. Sanghun Lee
4. Weather and climate data convergence analysis specialized graduate school
Funding Source: Korea Meteorological Institute
Period: 2022.06 - 2026.12 (4 year 7 months)
Principal Investigator: Prof. Changhyun Yoo (Associate Professor at EWU)
3. Frontier-1.5D
Funding Source: Hanwha Total Energies
Period: 2022.06 - 2023.05 (1 year)
Principal Investigator: Prof. Baehyun Min (Associate Professor at EWU)
2. Frontier-1.5D
Funding Source: Hanwha Solutions
Period: 2022.06 - 2023.05 (1 year)
Principal Investigator: Prof. Jin Hur (Associate Professor at EWU)
1. Process modeling and simulation study on new energy conversion and hydrogen energy systems
Funding Source: Ewha Womans University
Period: 2022.03 - 2024.02 (2 years)
Principal Investigator: Prof. Sanghun Lee