Overview of Status of Analysis, Design, Fabrication, Tests, etc.
Now have unified code for communication via app and temperature control
Purchased and awaiting capacitors and inductors for filter implementation
Accomplishments from Previous Week
Finished debugging code for bluetooth communication with phone (can now set reference temperature through phone)
Combined bluetooth communication code with temperature control code
Implemented safe temperature range checks in controller code
Successfully send data from phone to directly effect controller. Basic bug testing wireless communication
Goals for Next Week (list names after each item). Use specific and measurable objectives
Figure out circuit and code for RTD (Justin)
Look into conductive film/cloth for covering TED (Justin)
Purchase circuit elements required for RTD circuit (Tom, Kam)
Research options for implementing reverse current control on microcontroller, i.e H-bridge (Jeffrey)
Test and debug unified bluetooth+temperature control code (Tom, Kam)
Acquire oscilloscope (Tom, Kam)
Sponsor Comments from Last Meeting and Actions Taken to Address these Comments (indicate date of comments and if via email or in person)
Sponsor stated cost of mass production of TED itself will be quite low (5/3, via email)
Sponsor confirmed that +/- 1 degree (C) is adequate for temperature controller (5/3, via email)
Sponsor stated that a thin membrane covering the TED (protect from dirt/debris) is necessary (5/3, via email)
Instructor Comments from Last Meeting and Actions Taken to Address these Comments (indicate date of comments and if via email or in person)
Use vertical orientation of TEDs to dissipate heat via natural convection more effectively (4/27/20, via zoom)
May insert fins (not very densely) (4/27/20, via zoom)
Use integral capping algorithm to eliminate integrator windup issue (4/27/20, via zoom)
Test for integrator windup issue by incrementing 2-3 degrees at a time
Introduce derivative action into controller to reduce overshoot (4/27/20, via zoom)
Comments from Other Students in the Class (indicate date of comments and if via email or in person)
Fix the overshoot in temperature rise (4/27/20, via zoom)
Risks and Areas of Concern
None
Resources or Information Required but not Available
Get Oscilloscope this week
Schedule
Finish performing control on commercial TED with full functionality (wireless, bidirectional operation)
Budget (list amount spent and amount remaining)
Spent $394.61 (Remaining $1605.39)
Progress on Report and Webpage
Updated chapters 2, 3, 4, and 5 of report
Completed first draft of report
Updated webpage layout