Overview of Status of Analysis, Design, Fabrication, Tests, etc.
Completed building two walls
Finished cutting all the panels
Accomplishments from Previous Week
Finished laser-cutting the acrylic sheet for wall panels (Robbie, Joey, Alexis, Paul)
Completed building the bi-folding wall (Robbie, Joey, Alexis, Paul)
Completed building the single-folding wall (Robbie, Joey, Alexis, Paul)
Completed the 2nd draft of the final report (Everyone)
FEA inner support (Steven)
Goals for Next Week (list names after each item). Use specific and measurable objectives.
Finish cutting the acrylic doors and angle braces (Everyone)
Complete assembling the whole scale model (Everyone)
FEA of the full scale model on individual components (Robbie, Joey)
Part list and budget list of the final design (Everyone)
Write the fabrication/construction manual for the full scale design (Everyone)
Sponsor Comments from Last Meeting and Actions Taken to Address these Comments (indicate date of comments and if via email or in person)
Okay to assume wood is isotropic when performing FEA (May 29, via phone meeting)
FEA structural analysis is enough for testing the model
Instructor Comments from Last Meeting and Actions Taken to Address these Comments (indicate date of comments and if via email or in person)
Different material for inner support? (May 23, in person)
Almost impossible to make a perfect alignment. Any other way to lock the inner support? (May 23, in person)
Comments from Other Students in the Class (indicate date of comments and if via email or in person)
FEA of the final design after adding angle braces (May 23, in person)
Risks and Areas of Concern
Resources or Information Required but not Available
thickness and type of plywood in existing shipping container
Schedule
Complete building the scale model (by 6/3)
Update Gantt chart.
Budget (list amount spent and amount remaining)
$ 1581.14 Spent
$ 3418.86 Remaining
Progress on Report and Webpage
Completed 2nd draft of report
Updated Webpage