Overview of Status of Analysis, Design, Fabrication, Tests, etc.
Performed FBD and FEA analysis on the possible three wall designs
Performed FBD and FEA analysis on the inner support design.
Accomplishments from Previous Week
Individual component analysis
Alexis: hinges
Robbie: structural columns/beams
Steven: linear slider
Paul: materials strength
Joey: lifting hooks
Goals for Next Week (list names after each item). Use specific and measurable objectives.
Prepare for design proposal presentation (every team member will work on it together)
Powerpoint slides (Paul)
Integration of designs of the outer container and the inner support (CAD) (Joey, Alexis, Steven)
FEA the integrated design (Robbie)
3D print mechanism prototype to test the feasibility of the design (All)
Sponsor Comments from Last Meeting and Actions Taken to Address these Comments (indicate date of comments and if via email or in person)
Any scale can be used as long as it can be 3D printed or carried around for the poster session
Integration of ideas for the walls / inner support for next week's meeting
finalize the design and decide on a specific collapsible mechanism if possible
Instructor Comments from Last Meeting and Actions Taken to Address these Comments (indicate date of comments and if via email or in person)
Need to turn in student participation form (April 2nd)
Comments from Other Students in the Class (indicate date of comments and if via email or in person)
Looks in mesh analysis for FEA (April 2nd)
Risks and Areas of Concern
Exact design for the collapsible / contractible mechanism.
The materials decision for the shipping container.
Resources or Information Required but not Available
Schedule
Have designed/integrated box CADed by week 2
Design proposal presentation in week 2
Budget (list amount spent and amount remaining)
$ 0 spent
$5000 remaining
Progress on Report and Webpage
Complete sections of the report for week 2