Overview of Status of Analysis, Design, Fabrication, Tests, etc.
Heating
wired together with the relays and runs with code
Stirring
wired with arduino
creating boundary so that the magnetic stir can catch onto the motor
Controls
arduino code written
run and tested with solenoid and heaters
Valve
solenoid wired/code tested (time based)
Accomplishments from Previous Week
Heating
immersion heater is activated using temperature sensor control
all are wired together with relays and arduino and code
waiting on high-temp glue to glue insulation to coffeemaker frame
made clamp for immersion heater
Stirring
base made
smaller magnetic stir bar made
Controls
arduino code functional and works with our components
Valve
wired with arduino and tested using time based controls (to account for steeping)
Goals for Next Week (list names after each item). Use specific and measurable objectives.
Heating (All)
need to test the all the heaters with water
need to replace immersion heater (burned out during test)
make mounts/glue on heating elements (Soo)
Stirring
base needs to be extended (Ian)
creating silicone barrier so that magnetic stir bar stays in middle (Soo)
Controls
finish tweaking and testing code (when run with water and ingredients) (Shahin)
clean and finish wiring (Arun)
Valve (Arun)
need to mount solenoid to frame
Sponsor Comments from Last Meeting and Actions Taken to Address these Comments (indicate date of comments and if via email or in person)
Friday March 4th (Prince)
Went over the progress of our project
told us that we should try to test with tea as soon as possible
Instructor Comments from Last Meeting and Actions Taken to Address these Comments (indicate date of comments and if via email or in person)
Work on controls
talked a lot about closed loop control and temperature sensors
wired up temperature sensors and other motors/
Comments from Other Students in the Class (indicate date of comments and if via email or in person)
Risks and Areas of Concern
Resources or Information Required but not Available
Schedule
Milestone: creating tea with all parts integrated
Budget (list amount spent and amount remaining)
$770 spent, $230 remaining
Progress on Report and Webpage
Report is almost done being corrected (using notes from peer edited paper)
Webpage: pictures need to be updated with current progress