Overview of Status of Analysis, Design, Fabrication, Tests, etc.
Mark 6 FLUD Filling Station currently being printed/processed
Functionally identical to previous iteration, primarily ergonomic/cosmetic changes (did address sterilizability concern)
Mark 6 FLUD Incubation Container currently being printed/processed
Incubation testing to be performed when parts are ready
Accomplishments from Previous Week
Finalized design changes to Mark 6 FLUD system of devices
FLUD Filling Station: https://cad.onshape.com/documents/7cffbd0b213f152a0bcc4889/w/703c78be10b845e0725a43f6/e/26645707535d5d6f9d7154fc
FLUD Incubation Container: https://cad.onshape.com/documents/1c429b2875f808106ff7d2e4/w/a6cb370d48158456e0e9780f/e/970fc1961f5d7e167362948f
FLUD Imaging Rack: https://cad.onshape.com/documents/6e5afbda8dd7fdc5cb185809/w/7fed60af29a1058debbc20a2/e/197e1ce1b6bb4f5e0ad3fc10
Delivered Preliminary Design Review Presentation to class
Goals for Next Week
Deliver working prototype of FLUD system to sponsor (TEAM, 5/31/16)
Develop and deliver working manual to sponsor (TEAM, 5/31/16)
Meet with sponsor to deliver Final Design Review (TEAM, 06/01/16)
Discuss topics of patents/research publication
Begin developing CAD package and deliverable package (TEAM, 6/03/16)
Sponsor Comments from Last Meeting and Actions Taken to Address these Comments (indicate date of comments and if via email or in person)
Quantifiable data of speed increase requested (5/19/16)
Quantified reduction in fill time, as well as consistency of fill heights
Instructor Comments from Last Meeting and Actions Taken to Address these Comments (indicate date of comments and if via email or in person)
Change the ergonomics of the rotator (5/19/16)
Mark 6 FLUD Filling Station implements a new grasping feature
Address sterilizability concerns (5/19/16)
Performed accelerated-life sterilization testing with 100% ethanol (thanks to Young Woo Seo for the assistance)
Added modularity to FLUD Filling Station
Risks and Areas of Concern
Usability of final prototype
Information Required
Performance of device from sponsor testing in lab conditions (will get a usable prototype to sponsor early in Week 10)
Budget
$635 spent, $1375 remaining (calculated 3D printing expenses)
Progress on Report and Webpage
2nd Draft of Final Report completed (Submitted at end of Week 8)
Report awaiting peer feedback
Complete peer feedback of ATA peer report (5/27/16)
First draft of poster (5/27/16)