Your task is to design a structure to house these new moon-based research activities with a safe zone for your astronaut. Students will design and construct an original structure using only recycled cardboard that can withstand the highest amount of impact, is lightweight, and meets the specific size requirements
2025-26 SUBMISSION
Engineering Lab Books are due on February 20th at 11am
Only one submission per team. Note that we will only accept the first submission to be judged.
All documents should be labeled as followed: students’ first names, underscore, school.
For example: dolujanienesarah_CSUEB
Moon Base 2025-2026 Draft Rules
 2025-26-HS_Moon-Base-DRAFT.pdf
2025-26-HS_Moon-Base-DRAFT.pdfEngineering Lab Book
Engineering Lab Book Rules
 MESA-DAY-25-26-Engineering-Lab-Report-Guidelines.pdf
MESA-DAY-25-26-Engineering-Lab-Report-Guidelines.pdfEngineering Lab Book Template
 Engineering-Lab-Report-Example-1 (1).pdf
Engineering-Lab-Report-Example-1 (1).pdf MESA-DAY-25-26-Engineering-Lab-Report-Template-Doc.docx
MESA-DAY-25-26-Engineering-Lab-Report-Template-Doc.docx MESA-Day-25-26-Engineering-Lab-Report_Template-GSlides.pptx
MESA-Day-25-26-Engineering-Lab-Report_Template-GSlides.pptxEngineering Design Process - thank you to our friends at USC MESA for this amazing resource!
 The Engineering Design Process.pdf
The Engineering Design Process.pdfFall Virtual MESA Week Presentation