Projects Completed Since 2005
REFERENDUM 2003
B. Bernice Young School F Wing Addition with 18 classrooms
Building of the Burlington Township Middle School at Springside
Renovations to the Thomas O Hopkins Building
Renovations to the B. Bernice Young School A wing Toilet Room
Renovations to the B. Bernice Young School Kitchen and Cafeteria
ROD Grants II, III and IV
Cameras, locks, secure vestibules at all schools under Project Guardian
Drainage at Fountain Woods School
Toilet room renovations at High School and Hopkins
Window and door replacements at Hopkins and High School
HVAC upgrades at Hopkins, High School and B. Bernice Young School
Electrical upgrades and generator at B. Bernice Young School and High School
Partial roof replacement at B. Bernice Young School
Capital Reserve Funds
Toilet Room Renovations High School
Toilet Room Renovations Hopkins Building
HVAC Hopkins Building
Press Box Replacement
Maintenance, Grounds and Technology Funds
Bottle filling stations and water fountain replacements
Electrical upgrades
LED lightning changes to Fountain Woods gym, High School main gym and Hopkins gym
LED lighting changes in various classrooms and hallways throughout the district
Emergency circuit installation as needed
High School Courtyard paver project
Drainage correction between C and B wings High School
Renovation of High School Connector Corridor known as the “Breezeway”
Creation of 10 computer labs across the district
Installation of projectors in classrooms across the district
Replacement of worn playground equipment
Installation of numerous technology backbone items to ensure future growth of network
Asbestos abatement where needed
Flooring replacements where needed