C. Buildings.

C.1 Approved Building plan, showing the location of the different buildings in the campus.


C.1.pdf

C.2 Evidence that electrical lines are safely installed and periodically checked.



C.2 electrical.pdf

C.3 Schedule of water potability testing and pest control inspection.


C.3.pdf

C.4 PDF of the Janitorial staff, including work schedule.


C.4'.pdf