Trade Permit Applications

ALL TRADE APPLICATIONS BELOW SCROLL DOWN TO THE APPLICATION YOU NEED


Electrical Permit:

    • Includes generators and new services and IF electrical is being provided to a tent.

    • Use this form if you're signing on to a larger project.

    • Construction Type for single family and wood construction buildings are typically V-B.

    • Please see Informational Documents & Handouts regarding Arch-Fault requirements, ground fault circuits, and smoke and carbon monoxide detectors.

Click on APPLICATIONS BELOW to start your APPROVAL PROCESS.

Electrical applications can be downloaded and emailed to the building department or filled out and dropped of at the Municipal Center. Please provide all necessary documentation in addition to the application for approval. Insufficient information may delay the project up to 90 days. Generators and condenser units and all other equipment outside the building will need review by Health if well and septic are on site and BY ZONING. DO NOT SUBMIT APPLICATION WITH OUT GETTING ZONING AND HEALTH APPROVALS FOR EQUIPMENT OUTSIDE! Docusign has been discontinued.


* Do not use a comma or dollar sign when entering the Construction Cost amount.
ELECTRICAL APPLICATION ONLINE (2018).pdf

Please fill out electrical permit IF electrical is being supplied to a tent be sure to get Zoning and Health approval prior to applying to the Building Department!

Plumbing/Gas/Sprinkler Permit:

    • Use this form if you're signing on to a larger project.

    • Do not use this form for replacement heating or A/C systems. Instead use the HVAC Application below.

    • Construction Type for single family and wood construction buildings are typically V-B.

    • It is important to attach the manufacturer specifications and the model number(s) and type to your application.

Click on Plumbing APPLICATION to start your application.

Plumbing/Gas/Sprinkler applications can be downloaded and emailed to the building department or filled out and dropped of at the Municipal Center. Please provide all necessary documentation in addition to the application for approval. Insufficient information may delay the project up to 90 days. DO NOT SUBMIT APPLICATION WITH OUT GETTING ZONING AND HEALTH APPROVALS FOR EQUIPMENT OUTSIDE! Docusign has been discontinued.


* Do not use a comma or dollar sign when entering the Construction Cost amount.
PLUMB-GAS-SPRINK APPLICATION_ONLINE (2018).pdf

General Permit:

    • For all general carpentry work including replacing windows, re-roofing, and the removing of an oil tank.

    • Do not use this form for gas or replacement heating systems.

    • Construction Type for single family and wood construction buildings will typically be V-B.

    • Use the the general form for temporary tents and attach tent information sheet (link below General Permit)

Click on General Trades APPLICATION to start your application.

General applications can be downloaded and emailed to the building department or filled out and dropped of at the Municipal Center. Please provide all necessary documentation in addition to the application for approval. Insufficient information may delay the project up to 90 days. For minor interior work not requiring health and zoning approval please provide a before and after floor plan with dimensions and label rooms.

DO NOT US THIS APPLICATION FOR ANY STRUCTURE OUTSIDE OF THE BUILDING OR HOME; DECKS, POOLS, SHEDS, EXTERIOR STAIRS, AND OTHER EXTENSIONS TO THE FOOT PRINT OR PLACED ON SITE MUST HAVE HEALTH AND ZONING APPROVALS FIRST. THE FORMS TO BE USED AFTER HEALTH AND ZONING APPROVAL ARE ON THE FIRST PAGE OF THE WEBSITE "APPLICATION FOR ONE AND TWO FAMILY" OR APPLICATION FOR COMMERCIAL STRUCTURES. Docusign has been discontinued.


* Do not use a comma or dollar sign when entering the Construction Cost amount.
GENERAL_APPLICATION ONLINE_(2018).pdf

Please fill out TENT INFORMATION SHEET and electrical APPLICATION above if electrical is being supplied to a tent be sure to get Zoning and Health approval prior to applying to the Building Department!

HVAC Permit:

    • Use this form if you're signing on to a larger project.

    • Do not use this form for gas line work . Instead use the Plumbing Application above.

    • Construction Type for single family and wood construction buildings will typically be V-B.

    • It is important to attach the manufacturer specifications and the model number(s) and type to your application.

    • NEW HVAC SYSTEMS require the ACCA short form to be provide along with application which is below and to the right of the application

Click on HVAC APPLICATION to start your application.

HVAC applications can be downloaded and emailed to the building department or filled out and dropped of at the Municipal Center. Please provide all necessary documentation in addition to the application for approval. Insufficient information may delay the project up to 90 days. Docusign has been discontinued.


* Do not use a comma or dollar sign when entering the Construction Cost amount.
HVAC APPLICATION ONLINE (2018).pdf
HVAC-Design-Review-Form-101-ICC Bethel VER 1.pdf

Solar/P.V. Permit:

    • Use this form if you're installing solar equipment along with any structural upgrades.

    • Do not use this application for any electrical work associated with the installation of solar equipment. Instead use the Electrical Application above.

    • Construction Type for single family and wood construction buildings will typically be V-B.

    • Please provide a structural sheet or your own information showing that a structural evaluation by a licensed structural engineer was done.

Click on Solar/P.V. APPLICATION to start your application.

Solar application can be downloaded and emailed to the building department or filled out and dropped of at the Municipal Center. Please provide all necessary documentation in addition to the application for approval. Insufficient information may delay the project up to 90 days. Structural evaluation mandatory for approval. Docusign has been discontinued.

* Do not use a comma or dollar sign when entering the Construction Cost amount.
PV ONLINE APPLICATION (2018).pdf