You can see that we had a little mechanical assistance to deliver the wooden decking to the bridge site. Some brute force was still required!

Students broke into teams and began to fasten the numbered boards to their correct location. Wet boots were required for this installation day, for sure!

The students made the design more difficult by making a bridge that had a turn in the middle. Despite this, just two deck boards had to be cut on site to fit!