Overview of Status of Analysis, Design, Fabrication, Tests, etc.
Final Testing and Fabrication
Accomplishments from Previous Week
Tested Peristaltic pump
Tested Grinds ramp
Tested PLA Annealing
Progress on water heater mount
Purchased remaining necessary hardware
Iterated 3DP valve mounts
Consolidated code for everything except UI
Goals for Next Week (list names after each item). Use specific and measurable objectives.
Implement peristaltic pump cleaning system and create clea(Alec)
Print HTPLA parts (Alec)
Finalize electronic board connections (Alec)
Update Wiring diagrams (Alec)
Iterate on grinds ramp (Alec)
Test finalized system code (Phil)
Finalize user interface (Phil)
Finish heating module ramp (Phil)
Mount for thermocouple (Phil)
Test grinder and finish timing equation (Sebastian)
Finalize quick-disconnect system and filter holder (Sebastian)
Finalize electronics board size and mounting location (Sebastian)
Finalize front panel design (Sebastian)
Reassemble system (team)
Update Bill of Materials (team)
Sign additional patent form (team)
Sponsor Comments from Last Meeting and Actions Taken to Address these Comments (indicate date of comments and if via email or in person)
All comments made over conference call on 2/28/19
Integrate peristaltic pump for cleaning cycle
Integrate cleaning cycle into brewing cycle
Focus on cleaning and fine tuning brew over immaculate documentation
Instructor Comments from Last Meeting and Actions Taken to Address these Comments (indicate date of comments and if via email or in person)
All comments made 2/26/19 in person
Make sure all tubing, fittings, etc are food-grade materials
list the exact material they are made of
Incorporate (project-irrelevant) standards into "future design recommendations" section
Comments from Other Students in the Class (indicate date of comments and if via email or in person)
N/A
Risks and Areas of Concern
Arduino Programming is becoming complex
UI may be more limited than expected
PLA parts badly deformed after annealing
Resources or Information Required but not Available
N/A
Schedule
Wk9: HTPLA parts + front panel + finish assembly + bells and whistles + Finalize code
Wk10: bells and whistles + last minute changes
Budget (list amount spent and amount remaining)
Spent: $963.76
Remaining: $2,536.24
Progress on Report and Webpage
Report is 85% done, cleaning up and finalizing system CAD
Webpage will be 100% done once report is finalized