Overview of Status of Analysis, Design, Fabrication, Tests, etc.
Final Assembly of System [mounts, connections]
A Lot of Code (200 lines)
Filter Testing
Accomplishments from Previous Week
Fabricated and validated new filter design
New ramp design
Mounted Water boiling system on slanted plane
Panels
Wire management
Functional LCD screen
3d printed more mounts
Goals for Next Week (list names after each item). Use specific and measurable objectives.
FINISHHHHH
LCD clock for timer [stretch goal] (Phil)
Print final grinds ramp (Sebastian
Panels cutting [power button, roof, front, transparent side to look inside, logo?] (Sebastian)
Test Peristaltic cleaning cycle (Alec)
Sponsor Comments from Last Meeting and Actions Taken to Address these Comments (indicate date of comments and if via email or in person)
One see-thru panel to look inside
New ramp design to clip ramp into grinder
Limit switch for serving cup
Send them a folder of pics of design
order RTC
email phil's code
label parts and cables
Instructor Comments from Last Meeting and Actions Taken to Address these Comments (indicate date of comments and if via email or in person)
Polycarbonate option for filter
Or aluminum cnc QD design
try chemically welding NPT adapter to cap
If tall, make sure it doesnt tip over
neoprene insulation for valve mounts
Comments from Other Students in the Class (indicate date of comments and if via email or in person)
Risks and Areas of Concern
Need a way to shield control board from water, just in case
if we want to finish by friday, lots of work still need to be done
Resources or Information Required but not Available
Schedule
Wk10: finish all weekly goals, pics for poster and report, finish poster and report
Budget (list amount spent and amount remaining)
Spent: $963.76
Remaining: $2,536.24
Progress on Report and Webpage
Report is 85% done, cleaning up and finalizing system CAD
Webpage will be 100% done once report is finalized