Overview of Status of Analysis, Design, Fabrication, Tests, etc.
Prototype fabrication and testing
Accomplishments from Previous Week
Finalized machine dimensions to order all the parts (Alec, Seb)
Ordered parts for the assembly (ALL)
Prototyped circuit to control grinder motor with Arduino (Seb)
test 1/2'' and 1/4'' tubing and create more detailed CAD (Alec)
Created system control flowchart (Alec)
Goals for Next Week (list names after each item). Use specific and measurable objectives.
Take apart kettle, look into level sensors, figure out kettle shut off (Phil)
prototype QD, mesh prototype (Alec)
Get grinder working with Arduino/ explore new screw mechanism design (Sebastian)
Sponsor Comments from Last Meeting and Actions Taken to Address these Comments (indicate date of comments and if via email or in person)
All comments made in person on Thursday 1/24/2019
kettle needs to be titled slightly to drip all the water
figure out when kettle switches off
don't worry about stratification
thermocouple to track temperature of water/buy thermocouple
go with the switching power supply/order this week (instead of the AC "wall wart" power supplies)
reiumburesment dicussion
block diagram/stagger grinding and heating
discuss level sensors to detect water level
buy 8020 frame
discussed QD and tube diameter
discussed 3dp alterante solution
call on saturday to finalize BOM
Instructor Comments from Last Meeting and Actions Taken to Address these Comments (indicate date of comments and if via email or in person)
Individual power supplies vs. step down transformers
Temperature constraint of the pump
Particles getting into the pump (goes thru the pump and out)
Temperature stratification
adjusting pump power as water level decreases
running the pump super hot (testing in extreme environment aka hot water)
High Temperature o-rings
Comments from Other Students in the Class (indicate date of comments and if via email or in person)
N/A
Risks and Areas of Concern
Need to find 3d printing material that can withstand high temperature and is food safe
Non-self priming pump leaves excess coffee in tubing
Resources or Information Required but not Available
Need to find high temperature, high volume, self priming pump
Schedule
Upcoming milestones (due Friday):
Heat water to 205 °F
Pump heated water into brewing chamber
Grind and dispense coffee grounds
Functional system power supply
Next milestones (due 1/4)
Assemble prototype frame (aluminum extrusion)
Integrate functioning subsystems
Budget (list amount spent and amount remaining)
Spent: $416.85
Remaining: $3,083.15
Progress on Report and Webpage
Impact on society, done
Team page in progress