Overview
Evaluating potential designs
Investigating different spring concepts
Investigating material options for system frame
Accomplishments
Risk Reduction Presentation
Risk Reduction results made it apparent that other spring systems may need to be considered
Pneumatic springs
Goals for Next Week
Purchase pneumatic springs (Clifford, Niko)
Design frame system (Niko, Edward)
Design wheel/brake system (Steven)
Touch base with Dave/set up next meeting time (Edward)
Sponsor Comments
Sponsor has provided us with times throughout the week and a location to meet with him and Bodie
Tsavo’s Canine Rehabilitation and Fitness; Del Mar
Wednesday’s 7 PM & Saturday 5 PM
Sponsor mentioned interest in a knee brace system as part of the design or as an additional piece
Instructor Comments
Look into Century Spring Corporation for possibilities
Comments from Other Students
Other spring systems may be more effective
Risks and Areas of Concern
Risk Reduction results showed that our current spring system needs to be modified
Resources or Information Required
N/A
Schedule
Upcoming Milestones
Frame
Finalize design, purchase parts, assemble
Budget
Starting Budget : $2,500
Current Budget : $2,478.59 (spent: $21.41)
Purchased 2 torsion springs and 3 linear springs
Progress on Report and Webpage
Webpage setup
Report background started