Overview of Status of Analysis, Design, Fabrication, Tests, etc.
Completed initial Friction Drive Prototype
Completed initial Wire Storage Unit Prototype
Received Motor Data-Setting Cable necessary for control of motor using PC
Accomplishments from this Past Week
Completed initial prototypes for Friction Drive and Wire Storage Unit
Wrote first set of Operation Data to send to Motor via Data-Setting Cable
Bought and altered cables of Power Supply for Motor
Completed Proof of Concept Presentation Slides
Updated Gantt Chart
Goals for Next Week (list names after each item). Use specific and measurable objectives.
Complete First Draft of Final Report due Friday, 05/05/17
Update websites with new drawings and information
Buy new components to create Prototype 2 of the Friction Drive
Continue writing Operation Data for Motor and narrow down Usable Range of Torque
Sponsor Comments from Last Meeting and Actions Taken to Address these Comments (indicate date of comments and if via email or in person)
Sponsor Comments, From Week 4 In-person Meeting with Laura and Dan, 1:00 P.M. Friday, 04/28/17
Focus on successful drive and measurement of device rather than the retraction of the wire from the catheter
Team Actions
Fabricated handle on Wire Storage Unit for retraction of the measuring wire
Instructor Comments from Last Meeting and Actions Taken to Address these Comments (indicate date of comments and if via email or in person)
Instructor Comments, In-Person Week 4 Meeting, 4 P.M., Thursday, 04/27/17
Talk to Steve Roberts about motor Power Supply
Consider a Microsoft Surface to interface with the device
Work on the Final Report
Team Actions
Discussed with Steve Roberts about motor in general and bought a Power Supply and hooked it up to Motor
Considering Microsoft Surface or use of MCU and switches to control motor
Completed Revision 3 of the Final Report
Comments from Other Students in the Class (indicate date of comments and if via email or in person)
N/A
Risks and Areas of Concern
Time Risks (e.g. manufacturing of device and receiving shipment of parts on time)
Design Risks (e.g design is prone to high failure rate)
Production Risks (e.g. prototype is impossible to manufacture)
Hardware Failure Risks (e.g. purchased components are incompatible with design or prone to high failure rate)
Project Failure Risks (e.g. design is unable to work or be manufactured within the time-frame limit)
Resources or Information Required but not Available
N/A
Schedule
Proof of Concept Presentation on Thursday, 3:30 P.M. 05/04/17
Final Report, Draft 1 on Friday, 11:59 P.M., 05/05/17
Budget (list amount spent and amount remaining)
Total: $ 7500
Used so far:
$489.99, Motor Package from Oriental Motor
$46.29, Aluminum Cylinders from Online Metals
$13.99, Skateboard Bearings from Amazon Prime
Remaining: $ 6949.73 (same as previous week, Week 4)
Progress on Report and Webpage
Completed Revision 3 and continuing to revise for Final Report, Draft 1 deadline
Completed Week 5 Progress Report