Overview of Status of Analysis, Design, Fabrication, Tests, etc.
Decided on design to pursue for prototype (See "April 24th sketch 2.pdf" attached to this page)
Buying parts necessary to build prototype
Working out details for motor control and power source
Accomplishments from Previous Week
Went into greater detail of design using drawings (See drawings attached to this page)
Acquired bearings and bought aluminum cylinders for prototyping
Decided to power the motor using 24 VDC power adapter to plug into wall
Goals for Next Week (list names after each item). Use specific and measurable objectives.
Have a working prototype by Monday, 11:59 P.M., 05/01/17
Buy components necessary for prototyping, including but not limited to ...
24 VDC power adapter
Complete Proof of Concept Presentation Slides by Tuesday, 11:59 P.M., 05/02/17
Rehearse Wednesday, 05/03/17
Sponsor Comments from Last Meeting and Actions Taken to Address these Comments (indicate date of comments and if via email or in person)
Sponsor Comments, From Week 3 In-person Meeting with Laura, 1:30 P.M. Friday, 04/21/17
Cavi Wipes (1 min. / 5 min.) are indeed used for cleaning of objects in Procedure Room
Team Actions
Decided to not use acrylic for device
Instructor Comments from Last Meeting and Actions Taken to Address these Comments (indicate date of comments and if via email or in person)
Instructor Comments, In-Person Week 3 Meeting, 4 P.M., Thursday, 04/20/17
Cavi wipes are used for cleaning medical equipment, etc. May not react well with certain materials.
Your drawings are very valuable - put a date on them, use them in your presentation
Prefer another term over "chassis"
Team Actions
Confirmed with sponsor that Cavi Wipes are indeed used on equipment in the Procedure Room
Putting dates on all drawings, and captioning drawings for ease of understanding
Using the term "casing" instead of "chassis"
Comments from Other Students in the Class (indicate date of comments and if via email or in person)
N/A
Risks and Areas of Concern
Time Risks (e.g. manufacturing of device and receiving shipment of parts on time)
Design Risks (e.g design is prone to high failure rate)
Production Risks (e.g. prototype is impossible to manufacture)
Hardware Failure Risks (e.g. purchased components are incompatible with design or prone to high failure rate)
Project Failure Risks (e.g. design is unable to work or be manufactured within the time-frame limit)
Resources or Information Required but not Available
N/A
Schedule
Prototype for Proof of Concept by Tuesday, 05/02/17
Proof of Concept Presentation on Thursday, 05/04/17
Budget (list amount spent and amount remaining)
Total: $ 7500
Used so far:
$489.99, Motor Package from Oriental Motor
$46.29, Aluminum Cylinders from Online Metals
$13.99, Skateboard Bearings from Amazon Prime
Remaining: $ 6949.73
Progress on Report and Webpage
Completed Week 4 Progress Report