Overview of Status of Analysis, Design, Fabrication, Tests, etc.
Top of aluminum plate-- done machining
Still have to machine the sides of aluminum plate
Final design of machine complete
Accomplishments from Previous Week
All major parts have been ordered and should be in by this week
Began the process of machining aluminum plate
Goals for Next Week (list names after each item). Use specific and measurable objectives.
Complete machining/assembling the whole machine- all
Set up a time for next week for ATA to bring their DAS to UCSD to test- all
Fix any kinks within the system after testing- all
Design/machine back of fixture plate- Sam
Machine/assemble frame (especially waterjet tabs)- all
Impactor design finalization + machine- Troy
Label tubes, tabs, etc. for frame + assembly instructions- Leighy
Impact tips design + manufacture (pending fixture plate final mass) - Roy
Sponsor Comments from Last Meeting and Actions Taken to Address these Comments (indicate date of comments and if via email or in person)
Fixed vs. Pinned-- buckling analysis
Fixed-- 4x more stiff
Use the cut list to figure out beam length
Final presentation should included dimensioned CAD figures
Suggestion from Mike Pogue-- Hole drilling
Align in assembly, punch, drill press
No nylock per Jeff Kowtko's request
Basic rubber with locknut feet
Secondary strap is a priority safety item
Should have a discussion that addresses safety items in final report
Wants Belleville springlock washers for the type of washers
Instructor Comments from Last Meeting and Actions Taken to Address these Comments (indicate date of comments and if via email or in person)
Add more detail to report
Annotations, figures, analysis detail
Make sure to add names for each task under "Goals for Next Week"
Comments from Other Students in the Class (indicate date of comments and if via email or in person)
No comments so far
Risks and Areas of Concern
Time availability to test
We can't test without ATA's DAS
Setting up times that match both schedules is difficult
Not a lot of time remains to fix problems with our machineby week 10 after testing
Ensuring placement of fixture plate is repeatable on foam
impact velocity of impact head will be different (changes pulse amplitude)
Resources or Information Required but not Available
None-- ATA is very helpful in providing any resources/info we need
Schedule
Upload second draft of report by Friday midnight
Update Gantt chart.
Presentation Monday
Accomplish goals for this upcoming week (see above)
Budget (list amount spent and amount remaining)
Got our budget increased from $1500 to $2200
Spent: $1819.17
Remaining: $380.83
Progress on Report and Webpage
Report with instructor/TA revisions was uploaded by Friday midnight
Second draft of webpage for this upcoming Friday is in progress
Second draft of report for this upcoming Friday is in progress