Overview of Status of Analysis, Design, Fabrication, Tests, etc.
Final machine has been manufactured/assembled for testing on Monday 6/1/15 at 9:00 AM at UCSD (ATA will come here)
Once we have test results, create powerpoint presentation for Friday 6/5/15 at ATA at 11:00 AM.
Accomplishments from Previous Week
All parts have been manufactured and ready to be assembled.
Poster draft was created
Goals for Next Week (list names after each item). Use specific and measurable objectives.
Get in personal reimbursement forms- Leighy
Webpage- Sam & Leighy
Poster- group
Finish report- all
Instruction for assembly- all
Stamp tubes- Leighy, Sam & Troy
Create ATA presentation- all
Clean up analysis documentation for understandability- Roy
Sponsor Comments from Last Meeting and Actions Taken to Address these Comments (indicate date of comments and if via email or in person)
Great job, get ready for testing on Monday and be ready for Friday presentation.
Instructor Comments from Last Meeting and Actions Taken to Address these Comments (indicate date of comments and if via email or in person)
We showed instructor the frame
Be able to take apart/reassemble machine for poster session
Make sure it fits in the poster session room
Comments from Other Students in the Class (indicate date of comments and if via email or in person)
Students wished us luck on time (that we have enough time to manufacture/assemble machine for testing by Monday... and we did it!)
Risks and Areas of Concern
Nothing fails during testing
We ran dry tests once everything was assembled to prepare for ATA testing and everything seemed that it should be okay.
Short life of impact heads and if we have time to machine more heads for more testing.
Resources or Information Required but not Available
Nothing-- everything has been graciously made available to us by ATA.
Schedule
Testing on Monday 6/1 with ATA at UCSD
Update Gantt chart.
Final ATA presentation Friday 6/5
Budget (list amount spent and amount remaining)
$1881.43 spent
$318.57 remaining
Update with personal reimbursements ASAP
Progress on Report and Webpage