(2/27/12-3/2/12)
Overview of Status of Analysis, Design, Fabrication, Test, etc
Finalized design
CADed up in SolidWorks for fabrication
Studied motor control system
For more information, we will be speaking to the expert in Delta Design about the control system
Put the order in for the materials
Ball bearings
Precision steel rod
Goals for next week
Fabrication
Finish inside assembly
Inside housing
Platform
Welding
Scheduled an appropriate time with Tom to weld center rod to the flange
Meet with sponsor and an engineer for control system
Need more information to run the motor
Currently, all the wires are connected; however, the motor does not work
Finish up SolidWorks and AutoCAD model
Run Finite Element Analysis on assemblies
Instructor comments from last meeting and actions taken
Simulation
Came up with simulation for Proof of Concept model
Matched with our final design to prove the our model works
Risks and areas of concern
Control system
Turning the motor is the main concern
Controlling to meet the functional requirements
Speed and position accuracy
Linearity of the center rod mounting
Schedule
Finish up fabricating inside assembly
Model analysis on SolidWorks
Budget
Risk Reduction and scale model: $215.20
Steel Rod and Ball Bearings: $104.77
Materials: $843.47