During Monday's class, we will closely examine and discuss the phases of building a residential home. It is important that you understand planning, sequencing and scheduling
Above please review the information in the three videos:
After conducting the library tutorial, conduct a journal search of your topic (2-3 sources)
Using MLA format write a one or two page paper elaborating on your findings
Final page of document should be the works cited page
Construct a bar chart to use in managing the construction of a one story "Ranch" home that is built on a slab. The project should have a minimum of 25 activities. Prior to generating the activities reveal aspects of the planning process. Include in the activities inspections that will need to be completed before the next activity is completed. Also, create a list of subcontractors that will be required to complete the project. Finally, show the durations for each activity.
By signing the contract, identify a number of activities that would happen right away. Explain how critical path identifies activities that, if delayed, will delay the entire project. Finally, identify the following: start to start, task sequencing, concurrent and float.
https://www.educationcorner.com/short-answer-tests.html
https://www.youtube.com/watch?v=Zm3Jq4JYTEI
http://www.home-building-answers.com/construction-project-scheduling.html
THE ARTICLE SHOULD DISCUSS EITHER PLANNING OR SCHEDULING IN THE BUILDING PROCESS.
THE PURPOSE OF THE ASSIGNMENT IS TO REINFORCE THE IMPORTANCE OF THE TWO CONCEPTS IN THE BUILDING PROCESS.
AFTER REVIEWING A NUMBER OF ARTICLES, SELECT ONE.
IF POSSIBLE, PROVIDE THE ARTICLE AUTHOR'S BIOGRAPHY OR BACKGROUND.
WHAT POSSIBLY MOTIVATED THE AUTHOR TO WRITE THE ARTICLE?
WHAT NEW INFORMATION DID YOU ACQUIRE FROM THE ARTICLE?
AFTER READING THE ARTICLE, DID YOU FIND INFORMATION ABOUT BIM OR WBS?
REMEMBER, THE ARTICLE PROJECT IS A "TEAM" ASSIGNMENT AND MUST FOLLOW MLA FORMATTING.