Select a local "commercial" project in the Austin area and provide a profile of the structure. At this point, simply select your structure and research the company.
Profile builder's history and background
Bidding requirements
Project Feasibility
Who is financing the project?
Cost estimate of the structure
Start and completion date
Location of the building project
Public or private build
Union vs non-union labor
Is this a green project
Who are the project players?
Delivery method of construction?
Scheduling fundamentals
Contract type and payment schedule?
Claim dispute resolution
Construction close-out
In some instances, you may need to contact the construction company to secure the prompt answers.
DISCUSS WHAT IS MEANT BY PROJECT CHRONO7LOGY; UTILIZE YOUR TEXT OR OUTSIDE RESOURCES TO SUPPORT YOUR ANSWER.
RAW LAND CLEAR
SURVEY
EXCAVATION
FORMING/REBAR
SLAB 4 INCHES - SIZE 30 X 42
2 CAR GARAGE
2X4 FRAMING 16 INCH OC
7/16 OSB SHEATHING/BUILDING WRAP
ROOF 4/12
ROOF SHEATHING 5/8 OSB--TWO FOOT OVERHANG "ALL" SIDES
ELECTRICITY--LIGHT IN SIDE GARAGE AND TWO LIGHTS OUTSIDE- 3 WAY LIGHT SWITCH (2)--GFI RECEPTACLES (3)
TWO GARAGE DOORS/GARAGE DOOR OPENER
TWO WINDOWS 3-4 ANDERSON
ONE DOOR 3-68
ROOF TAR PAPER 15 LB
THREE TAB SHINGLES
METAL DRIP EDGE
TRIM 1 X 4
HARDIE SIDING 1 X 8 --SIX INCH REVEAL
VINYL DOOR 3--68