Projects and Grants
International Projects and Grants
Australian Academy of Science - Taiwan Exchange Program, 015/07/01~2015/09/30, NSC 104-2911-1-007-526, Grant: NT$ 190,950.
Longbing Cao, W. C. Yeh (Co-Principal Investigator) “Determination of Contact Frequency and Offer Selection Algorithms to Optimise Loyalty Direct Marketing Activities Directed at Individual Qantas Frequent Flyer Members”, University of Technology, Sydney (UTS) Partnership Grants Scheme Application, Grant: AU$ 2,111,000 (Industry-University Cooperative Research Project:Qantas Airways Limited), 2012/07/25.
Co-leader of the project:”Development of the Intelligent Service Technology based on Personal Life Log”, 2008/10/01~2009/01/31, #2006-S032-3, Grant: $30,000, Principal Investigator:Dr. C. Bae (csbae@etri.re.kr), Electronics and Telecommunications Research Institute (ETRI, Korea).
Industry-University Cooperation (產學合作)
陳稼洺、葉維彰 (協同主持人),” 提升中醫脈診儀疾病體質診斷準確性研究計畫 (Improving the Diagnostic Accuracy of TCM Pulse Diagnosis Instrument For Disease Constitution )”,技術:大數據分析、時間序列數據分析、樹演算法,2023/01/01~2023/12/31,230305,彰化基督教醫院 + 工研院。
葉維彰,” AI Universal Code Recognition (AI萬用碼辨識)”,技術:樹演算法、CNN、OCR、統計分析,2023/07/01~2023/12/31,112A0193JB,益登科技股份有限公司。
葉維彰、林佳陞,” Intelligent test path search for probe card (智能化探針卡測試路徑搜尋)”,技術:樹演算法、圖形理論探、探針檢測,2023/06/01~2024/05/31,NSTC 112-2622-E-007-014,國科會產學合作(思衛科技股份有限公司)。
葉維彰,”i-SPC, AI technology application in SPC (人工智慧方法於統計製程管制之應用)”,技術:大數據分析、深度學習、製程改善,2022/08/01~2024/07/31,UMC: I-2022-05-067,聯華電子股份有限公司產學合作。
葉維彰,”建構晶圓瑕疵檢測與預防的區塊鏈式AI雲平臺”, 2022/06/01~2023/05/31, MOST 111-2622-E-007-017,國科會產學合作(信統科技股份有限公司)。
葉維彰,”工程轉譯“,2022/03/01-2022/12/31,109B6051TA,科研產業化平台計畫I-NTHU國際產學聯盟(GLORIA)計畫
葉維彰,”應對未來半導體發展趨勢帶來的巨量資料處理需求”,技術:資料庫優化、大數據分析、平行運算、影像處理、資料視覺化、統計分析、瑕疵檢測與分析,2021/05/07~2021/11/06,均豪機密工業股份有限公司產學合作。
葉維彰,”工程轉譯“,2021/01/01~2021/11/30,110Q2603E1,科研產業化平台計畫I-NTHU國際產學聯盟(GLORIA)計畫
葉維彰,產學合作研究計畫 (應用型)計畫主持人,”建構與研究新型『用電量預測模型』以推展並達成節能省碳之目的 (Constructing a prediced model for the energy conservation and carbon reduction — Apply topredict electricity capacities)”,技術:RNN (循環神經網路)運用、大數據分析; 用電量預測、建模、預測與優化,2009/07/01~2010/06/30, NSC 98-2622-E-007-009-CC3 (晶積科技股份有限公司產學合作)。
葉維彰,”切削時間的估計與製程可靠度的改善”,技術:系統可靠度計算、優化、建模、預測、模擬; 製程改善; 時間序列數據分析,子計畫共同主持人,2001/08/01至2002/07/31,逢甲大學與漢翔飛機機體事業部合作群體計畫,逢甲大學提供經費。
葉維彰,”小型系統鋼模排列自動化資訊系統開發”,協同主持人,技術:開發自動化資訊系統、排列組合優化、供應商選擇、路徑規劃、材料配送,1999/01至2000/06,營建署計畫:89-0801-01。
MOST/NSC Projects and Grants
Principal Investigator, ”Consider Time Varying on Network Reliability and Component Reliability of MicroGrid (整合人工智慧、機器手臂與精實管理等技術以優化統皓食品公司中央廚房產線運作 )”, 2023/08/01~2024/07/31, NSTC 112-2221-E-007-086.
Principal Investigator, ”Consider Time Varying on Network Reliability and Component Reliability of MicroGrid (考慮時間變化之微電網網絡可靠度與零件可靠度)”, 2023/08/01~2024/07/31, NSTC 112-2221-E-007-086.
Principal Investigator, ”Intelligent test path search for probe card (智能化探針卡測試路徑搜尋 )”, 2023/06/01~2024/05/31, NSTC 112-2622-E-007-014.
Principal Investigator, ”Construct an Blockchain AI Cloud Platform for Wafer ID Recognition and Defect Detection (建構晶圓瑕疵檢測與預防的區塊鏈式AI雲平臺 )”, 2022/06/01~2023/05/31, MOST 111-2622-E-007-017 , Grant: NT$ 961,000 + 500,000.
Principal Investigator, ”Study on Resilient and Reliability Information Networks in relation to Resilient Components and Potential Crises (彈性可靠資訊網路之研究)”, 2021/08/01~2024/07/31, MOST 110-2221-E-007-107-MY3, Grant: NT$ 2,480,000.
Principal Investigator, ”Study on the novel network reliability for all d problems (全d值網路可靠度創新問題之研究)”, 2018/08/01~2021/07/31, MOST 107-2221-E-007-072-MY3 , Grant: NT$ 3,061,000 (科技部特約研究計畫).
Principal Investigator, ”Propose Novel Path-Based Fundamental Algorithms and Discuss Frontier Network Reliability Models (新path-based 基礎演算法與新網路可靠度模式之研究)”, 2015/08/01~2018/07/31, MOST 104-2221-E-007-061-MY3, Grant: NT$ 2,399,000.
Principal Investigator, Postdoc Funding Opportunity, 2013/08/01~2015/07/31, 102N1807E1.
Principal Investigator, ” Reliability Problems for the Novel Multi-configuration Multi-state Network (多架構多階新型網路可靠度問題之探討)”, 2013/08/01~2016/07/31, MOST 102-2221-E-007-086-MY3, Grant: NT$ 2,476,000.
Principal Investigator,” A Novel Network with the Deterioration Effect and Solutions for Associated Reliability Problems (具有衰弱效應的新型網路及可靠度相關問題之研討)”, 2012/08/01~2015/07/31, NSC 101-2221-E-007-079-MY3, Grant: NT$ 2,882,000.
Co-Principal Investigator, “Air quality monitor, analysis, and control system development for the polluted environment”,2009/11/01~2010/10/31, NSC 98-2218-E-007-019, Grant: NT$ 2,078,000; 2010/11/01~2011/10/31, NSC 98-2218-E-007-007, Grant: NT$ 2,111,000; 2011/11/01~2012/10/31, NSC 98-2218-E-007-004, Grant: NT$ 2,111,000
Principal Investigator, “Constructing a predicted model for the energy conservation and carbon reduction — Apply topredict electricity capacities (建構與研究新型"用電量預測模型"以推展並達成節能省碳之目的)”, 2009/07/01~2010/06/30, NSC 98-2622-E-007-009-CC3, Grant: NT$ 782,880, 晶積科技股份有限公司
Principal Investigator, “A Study on Service Performance/Reliability Evaluation and Analysis in Grid Systems (Grid System之服務績效/可靠度的評估與分析)”, 2009/08/01~2012/07/31, NSC 98-2221-E-007-051-MY3, Grant: NT$ 1,826,000.
Principal Investigator, “Study on Quickest Path Networks with Dependent Components and Apply to RAP (探討、創建與應用元件相關、最快路徑的新網路問題)”, 2008/08/01~2011/07/31, NSC 97-2221-E-007-099-MY3 (Individual & Basic Research), Multiyear Research Project, Grant: NT$ 2,781,000, Distinguished Scholars Research Project granted by National Science Council, Taiwan. (This award is only for the top 4 researchers in the area of Industrial Engineering and/or Engineering Management in Taiwan)
Principal Investigator, “Studying on the Universal Generating Function (通用生成函數之研究)”, 2006/08/01~2008/07/31, NSC 95-2221-E-007-180-MY2, Multiyear Research Project, Grant: NT$ 942,000.
Principal Investigator, “Reliability Analysis of the General Network (廣義網路可靠度之探討)”, 2005/08/01~2006/07/31, NSC 94-2213-E-415-005, Grant: NT$ 702,000.
Principal Investigator, “The Construction of Various k-out-of-n Networks and the research on their Reliabilities”, 2004/08/01~2005/07/31, NSC 93-2213-E-035-012, Grant: NT$ 684,100.
Principal Investigator, “Studying on three Special Multi-State Flow Network Reliability Problems”, 2003/08/01~2004/07/31, NSC 92-2213-E-035-041, Grant: NT$ 726,900.
Principal Investigator, “Study on the Multistate-node Flow Network Reliability by Some Novel Approaches”, 2002/08/01~2003/07/31, NSC 91-2213-E-035-029, Grant: NT$ 503,400.
Principal Investigator, “Searching for MCs in Binary-State Networks and d-MCs in the Unreliable Network”, 2001/08/01~2002/07/31, NSC 90-2218-E-035-006, Grant: NT$ 382,300.
Principal Investigator, “Evaluating the Flow Network Reliability and Search for all MPs/d-MCs/d-MPs in the Network after adding a new path”, 2000/08/01~2001/07/31, NSC 89-2213-E-035-056, Grant: NT$ 260,700.
Principal Investigator, “Establishing New Algorithms for the Flow Network and their d-MCs”, 1999/08/01~2000/07/31, NSC 89-2213-E-035-017, Grant: NT$ 259,700.
Principal Investigator, “Constructing New Factoring Algorithm for the Flow Network Reliability”, 1998/08/01~1999/07/31, NSC 88-2213-E-035-017, Grant: NT$ 196,100.
Principal Investigator, “Developing New Algorithms for the Flow Network Reliability and its d-MCs”, 1997/08/01~1998/07/31, NSC 87-2213-E-035-018, Grant: NT$ 154,700.
Co-Principal Investigator, “Study on the n/m=2/Flowshop/(alpha*F+blta*Cmax) Flow Shop Scheduling Problem”, 1997/08/01~1998/07/31, NSC 87-2213-E-025-001, Grant: NT$ 154,700.
Principal Investigator, “Proposing the Analytical Method and Simulation for the Large-Scale Flow Network Reliability II”, 1995/02/01~1995/07/31, NSC 84-2213-E-035-015, Grant: NT$ 57,000.
Principal Investigator, “Proposing the Analytical Method and Simulation for the Large-Scale Flow Network Reliability I”, 1994/02/01~1995/01/31, NSC 83-0415-E-035-005, Grant: NT$ 110,000.
Principal Investigator, “Studying on the k-cut Problem”, 1993/01/01~1993/12/31, NSC 82-0113-E-214-019-T, Grant: NT$ 106,000.