Investigator, "Interdisciplinary Research on a Cross-Setting Smart-Care Decision System for Dementia Integrating Gait Stability Analysis and Fall-Risk Awareness", 2026, Ministry of Education, NTHU Project 115Q2712E1.
Principal Investigator, "Innovation Strategies for Next-Generation Network Reliability: Integrating GPU, Continual Learning, and Quantum Computing", 1 Aug 2025–31 Jul 2028, NSTC 114-2221-E-007-123-MY3.
Principal Investigator and Grant Recipient, "AMR Deployment via RL, Sensor Fusion & SSO Optimization", NVIDIA Academic Grant Program, awarded 2025.
Investigator, "5G Intelligent Private Network Deployment Project", Aug 2025–Nov 2025, Ministry of Education, NTHU Project 114QI020E1.
Principal Investigator, "Taiwan-India Bilateral Add-on International Collaboration Project: Building a Sustainable Manufacturing Supply Chain for Heavy Reactor Transportation Using Digital Twin Technology and Optimization Algorithms", 1 Jan 2025–31 Dec 2026, NSTC 114-2923-E-007-003-MY2.
Investigator, "Integrated AI Analysis and Functional Validation of Gut Microbiota Metabolites in Regulating the Pancreatic Cancer Tumor Immune Microenvironment", 1 Jan 2025–30 Nov 2025, Ministry of Education, NTHU Project 114Q2718E1.
Principal Investigator, "Predictive Maintenance and Health Management in Network Resilience", 1 Aug 2024–31 Jul 2027, NSTC 113-2221-E-007-117-MY3.
Investigator, "Knee Osteoarthritis Severity Classification and Fairness Study Based on Deep Learning and Swarm Intelligence Optimization", Jan 2024–Oct 2024, Ministry of Education.
Principal Investigator, ”Consider Time Varying on Network Reliability and Component Reliability of MicroGrid”, 1 Aug 2023–31 Jul 2024, NSTC 112-2221-E-007-086.
Principal Investigator, ”Intelligent test path search for probe card”, 1 Jun 2023–31 May 2024, NSTC 112-2622-E-007-014.
Principal Investigator, ”Construct an Blockchain AI Cloud Platform for Wafer ID Recognition and Defect Detection”, 1 Jun 2022–31 May 2023, MOST 111-2622-E-007-017 , Grant: NT$ 961,000 + 500,000.
Principal Investigator, ”Study on Resilient and Reliability Information Networks in relation to Resilient Components and Potential Crises”, 1 Aug 2021–31 Jul 2024, MOST 110-2221-E-007-107-MY3, Grant: NT$ 2,480,000.
Principal Investigator, ”Study on the novel network reliability for all d problems”, 1 Aug 2018–31 Jul 2021, MOST 107-2221-E-007-072-MY3, Grant: NT$ 3,061,000.
Principal Investigator, ”Propose Novel Path-Based Fundamental Algorithms and Discuss Frontier Network Reliability Models”, 1 Aug 2015–31 Jul 2018, MOST 104-2221-E-007-061-MY3, Grant: NT$ 2,399,000.
Australian Academy of Science - Taiwan Exchange Program, 1 Jul 2015–30 Sep 2015, NSC 104-2911-1-007-526, Grant: NT$ 190,950.
Principal Investigator, Postdoc Funding Opportunity, 1 Aug 2013–31 Jul 2015, 102N1807E1.
Principal Investigator, ” Reliability Problems for the Novel Multi-configuration Multi-state Network”, 1 Aug 2013–31 Jul 2016, MOST 102-2221-E-007-086-MY3, Grant: NT$ 2,476,000.
Principal Investigator,” A Novel Network with the Deterioration Effect and Solutions for Associated Reliability Problems”, 1 Aug 2012–31 Jul 2015, NSC 101-2221-E-007-079-MY3, Grant: NT$ 2,882,000.
Co-Principal Investigator, “Air quality monitor, analysis, and control system development for the polluted environment”,1 Nov 2009–31 Oct 2010, NSC 98-2218-E-007-019, Grant: NT$ 2,078,000; 1 Nov 2010–31 Oct 2011, NSC 98-2218-E-007-007, Grant: NT$ 2,111,000; 1 Nov 2011–31 Oct 2012, NSC 98-2218-E-007-004, Grant: NT$ 2,111,000
Principal Investigator, “Constructing a predicted model for the energy conservation and carbon reduction : Apply to predict electricity capacities”, 1 Jul 2009–30 Jun 2010, NSC 98-2622-E-007-009-CC3, Grant: NT$ 782,880
Principal Investigator, “A Study on Service Performance/Reliability Evaluation and Analysis in Grid Systems”, 1 Aug 2009–31 Jul 2012, NSC 98-2221-E-007-051-MY3, Grant: NT$ 1,826,000.
Principal Investigator, “Study on Quickest Path Networks with Dependent Components and Apply to RAP”, 1 Aug 2008–31 Jul 2011, NSC 97-2221-E-007-099-MY3 (Individual & Basic Research), Multiyear Research Project, Grant: NT$ 2,781,000, Distinguished Scholars Research Project granted by National Science Council, Taiwan.
Principal Investigator, “Studying on the Universal Generating Function”, 1 Aug 2006–31 Jul 2008, NSC 95-2221-E-007-180-MY2, Multiyear Research Project, Grant: NT$ 942,000.
Principal Investigator, “Reliability Analysis of the General Network”, 1 Aug 2005–31 Jul 2006, NSC 94-2213-E-415-005, Grant: NT$ 702,000.
Principal Investigator, “The Construction of Various k-out-of-n Networks and the research on their Reliabilities”, 1 Aug 2004–31 Jul 2005, NSC 93-2213-E-035-012, Grant: NT$ 684,100.
Principal Investigator, “Studying on three Special Multi-State Flow Network Reliability Problems”, 1 Aug 2003–31 Jul 2004, NSC 92-2213-E-035-041, Grant: NT$ 726,900.
Principal Investigator, “Study on the Multistate-node Flow Network Reliability by Some Novel Approaches”, 1 Aug 2002–31 Jul 2003, NSC 91-2213-E-035-029, Grant: NT$ 503,400.
Principal Investigator, “Searching for MCs in Binary-State Networks and d-MCs in the Unreliable Network”, 1 Aug 2001–31 Jul 2002, NSC 90-2218-E-035-006, Grant: NT$ 382,300.
Principal Investigator, “Evaluating the Flow Network Reliability and Search for all MPs/d-MCs/d-MPs in the Network after adding a new path”, 1 Aug 2000–31 Jul 2001, NSC 89-2213-E-035-056, Grant: NT$ 260,700.
Principal Investigator, “Establishing New Algorithms for the Flow Network and their d-MCs”, 1 Aug 1999–31 Jul 2000, NSC 89-2213-E-035-017, Grant: NT$ 259,700.
Principal Investigator, “Constructing New Factoring Algorithm for the Flow Network Reliability”, 1 Aug 1998–31 Jul 1999, NSC 88-2213-E-035-017, Grant: NT$ 196,100.
Principal Investigator, “Developing New Algorithms for the Flow Network Reliability and its d-MCs”, 1 Aug 1997–31 Jul 1998, NSC 87-2213-E-035-018, Grant: NT$ 154,700.
Co-Principal Investigator, “Study on the n/m=2/Flowshop/αF+βCmaxFlow Shop Scheduling Problem”, 1 Aug 1997–31 Jul 1998, NSC 87-2213-E-025-001, Grant: NT$ 154,700.
Principal Investigator, “Proposing the Analytical Method and Simulation for the Large-Scale Flow Network Reliability II”, 1 Feb 1995–31 Jul 1995, NSC 84-2213-E-035-015, Grant: NT$ 57,000.
Principal Investigator, “Proposing the Analytical Method and Simulation for the Large-Scale Flow Network Reliability I”, 1 Feb 1994–31 Jan 1995, NSC 83-0415-E-035-005, Grant: NT$ 110,000.
Principal Investigator, “Studying on the k-cut Problem”, 1 Jan 1993–31 Dec 1993, NSC 82-0113-E-214-019-T, Grant: NT$ 106,000.
Patent licensing. Taiwan invention patent I419070, “Relative Variable Selection System and Selection Method Thereof,” licensed for a fee to 台灣智慧資本股份有限公司.
W. C. Yeh, "Agentic AI-Driven Contact-Rich Operations Platform", 1 Jan 2026–31 Dec 2026, Industrial Technology Research Institute (ITRI), Ministry of Economic Affairs / ITRI Innovative Forward-Looking Academic Research Collaboration, Grant: NT$1,000,000.
W. C. Yeh, "NVIDIA Omniverse: Basic Operations and Application Scenario Development", 1 Jan 2026–30 Jun 2026, Industrial Technology Research Institute (ITRI), NTHU Project 115A0023JB, Grant: NT$800,000.
W. C. Yeh, "Commissioned GAI Model Development for Gradient Dummy Pattern Automated Design Service", 10–19 Dec 2025, Industrial Technology Research Institute (ITRI), NTHU Project 114A0299JB, Total Project Value: NT$500,000.
W. C. Yeh, "Intelligent Mobile AI Model Design and Development", 1 Oct 2025–30 Sep 2026, Asia Optical Co., Inc., NTHU Project 114A0271JB, Grant: NT$1,500,000.
W. C. Yeh, "Artificial Intelligence Methods for Production Operations Scheduling", 1 May 2025–31 Oct 2025, 大新責任有限公司 (Vietnam), NTHU Project 114A0143JB, Revised Project Value: NT$520,370.
W. C. Yeh, "Applying Skeleton Detection Technology for Gait Analysis", Oct 2024–Apr 2025, Bestcare Elderly Welfare Corp., NTHU Project 113A0205JB.
W. C. Yeh, "Development of an AOI Recognition System to Improve Quality Inspection", Feb 2024–Oct 2024, JIH YU ACCURATE INDUSTRIAL CO., LTD., NTHU Project 113A0051JB.
W. C. Yeh, "Integrating AI, Robotic Arms, and Lean Management Technologies to Optimize Central Kitchen Production Line Operations at Tonghao Food Company", 1 Nov 2023–31 Oct 2024, NSTC112-2622-E-007-025, NSTC Industry-University Cooperation (Tonghao Food Company).
J. M. Chen and W. C. Yeh (Co-PI), "Improving the Diagnostic Accuracy of TCM Pulse Diagnosis Instrument for Disease Constitution", Technologies: Big Data, Data Mining, Time Series Data Analysis, Tree Algorithm, 1 Jan 2023–31 Dec 2023, 230305, Changhua Christian Hospital + ITRI.
W. C. Yeh, "AI Universal Code Recognition", Technologies: Tree Algorithm, CNN, OCR, Statistical Analysis, 1 Jul 2023–31 Dec 2023, 112A0193JB, Edom Technology Co., Ltd.
W. C. Yeh and J. S. Lin, "Intelligent Test Path Search for Probe Card", Technologies: Tree Algorithm, Graph Theory, Probe Testing, 1 Jun 2023–31 May 2024, NSTC 112-2622-E-007-014, NSTC Industry-University Cooperation (SiWei Technology Co., Ltd.).
W. C. Yeh, "Application of Artificial Intelligence Methods to Statistical Process Control", Technologies: Big Data Analysis, Deep Learning, Process Improvement, 1 Aug 2022–31 Jul 2024, UMC: I-2022-05-067, Industry-University Cooperation with United Microelectronics Corporation (UMC).
W. C. Yeh, "Constructing a Blockchain-Based AI Cloud Platform for Wafer Defect Detection and Prevention", MOST Industry-University Cooperation, Technologies: Big Data Analysis, Image Processing, Defect Detection and Analysis, Deep Learning, 1 Jun 2022–31 May 2023, MOST 111-2622-E-007-017, Sintong Information Technology Co., Ltd.
W. C. Yeh, "Addressing Big Data Processing Demands Driven by Future Semiconductor Development Trends", Technologies: Database Optimization, Big Data Analysis, Parallel Computing, Image Processing, Data Visualization, Statistical Analysis, Defect Detection and Analysis, 17 May 2021–16 Nov 2021, 110A0079JB, Industry-University Cooperation with Grand Precision Machinery Co., Ltd.
Co-leader of the project, "Internet of Things Intelligent Manufacturing Technology and Forensics", 1 Jan 2015–31 Dec 2017, Towards a Leading Research Center Integrated Project, (1 Jan 2015–31 Dec 2016, 104N2074E1; 1 Jan 2017–31 Dec 2017, 106N536CE1).
Co-leader of the project, "Research and Development of Fundamental Technology and Performance Evaluation of Advanced Manufacturing Systems", Towards a Leading Research Center Integrated Project, 1 Jan 2013–31 Dec 2014, 103N2075E1.
Co-leader of the project, "Optimization of the End-of-Life Disassembly Sequencing Problem based on a Self-adaptive Simplified Swarm Optimization with Precedence Preservative Operator", 1 Aug 2011–31 Dec 2012, Toward World-Class Universities Project, National Tsing Hua University, 100N2073E1/101N2073E1, Grant: NT$800,000.
Principal Investigator, "Novel Multi-Resource and Multi-State Quickest-Path Network for Managing Real-Time Traffic in Multimedia Data", Boost Program, 1 Mar 2010–31 Dec 2010, NTHU, 99N2926E1, Grant: NT$ 700,000.
Principal Investigator, "Constructing a Predicted Model for Energy Conservation and Carbon Reduction : Applied to Predict Electricity Capacities", 1 Jul 2009–30 Jun 2010, NSC 98-2622-E-007-009-CC3, Grant: NT$ 782,880.
Principal Investigator, "Study on Network Reliabilities", Boost Program, 1 Jan 2007–31 Dec 2009, NTHU, 96N2520E1, Grant: NT$ 2,100,000.
Co-leader of the project, "Development of the Intelligent Service Technology based on Personal Life Log", 1 Oct 2008–31 Jan 2009, #2006-S032-3, Grant: $30,000, Principal Investigator: Dr. C. Bae (csbae@etri.re.kr), Electronics and Telecommunications Research Institute (ETRI, Korea).
W. C. Yeh, "Estimation of Cutting Time and Improvement of Process Reliability", Sub-project Co-PI, 1 Aug 2001–31 Jul 2002, Technologies: System Reliability Calculation, Optimization, Modeling, Prediction, Simulation; Process Improvement; Time Series Data Analysis, Feng Chia University and AIDC Airframe Division Cooperative Group Project.
W. C. Yeh, "Development of Automated Information System for Small-Scale Steel Mold Arrangement", Co-PI, Jan 1999–Jun 2000, Technologies: Automated Information System Development, Combinatorial Optimization, Supplier Selection, Route Planning, Material Delivery, Construction and Planning Agency Project: 89-0801-01.