Electro-removal of microplastics: Pioneering sustainable electrocatalysis for the elimination of microplastics from water matrices, Duration: 3 years, Role: PI, Funding agency: Anusandhan National Research Foundation (ANRF), India. (Ongoing)
Advanced microplastic quantification techniques, Duration: 1 year, Role: PI, Funding agency: Industrial R&D Unit (IRD), IIT Delhi, India. (Ongoing)
Removal of micropollutants from water matrix through bioelectrochemical system, Duration: 2 years, Role: PI, Funding agency: IIT Delhi, India. (Ongoing)
Energy Recovery from Municipal Solid Waste using the Biomethanation process, Duration: 2 years, Role: Co-PI, Funding agency: CPHEEO, India. (Ongoing)
Sustainable management and rejuvenation of water bodies in Mundka village, Delhi, Role: PI, Funding agency: Delhi Development Authority, India. (Ongoing)
Waste characterization of solid waste generated at Delhi Airport, Role: PI, Funding agency: Delhi International Airport Limited, New Delhi, India. (Ongoing)
Geophysical exploration of Rajasthan Waste Management Project (RWMP), Udaipur, Role: PI, Funding agency: Re Sustainability Limited, Rajasthan, India. (Ongoing)
Geophysical exploration of Odisha Waste Management Project (OWMP), Jajpur, Role: PI, Funding agency: Re Sustainability Limited, Rajasthan, India. (Ongoing)
Integrated Water Conservation System at BML Munjal University, funded by ICICI Foundation, Role: PI, Funding agency: ICICI Foundation, India.
Expert Advice and Guidance on Design and Drawings of 66 MLD STP at Ghaziabad, Role: PI, Funding agency: Samrath EPC Private Limited, India. (Ongoing)
Finalizing of the detailed project report (DPR) as per the prevalent engineering practices and the NCRPB Guidelines for Augmentation of Master Water Supply, Faridabad, Role: PI, Funding agency: Faridabad Metropolitan Development Authority, Haryana, India. (Ongoing)
Inspection of Grossly Polluting Industry (GPIs) for the year 2025, Role: Co-PI, Funding agency: Central Pollution Control Board (CPCB), India. (Ongoing)
Design, construction and commissioning of 45 MLD sewage treatment plant in Greater Noida, Role: PI, Funding agency: HNB Engineers Private Limited, Noida, India. (Ongoing)
Vetting of designs and drawings of 150 MLD STP at Bhilai, Chhattisgarh, along with its associated works, Role: PI, Funding agency: HNB Engineers Private Limited, Noida, India. (Ongoing)
Smart water management system by providing energy saving solution in Ganga Jal distribution scheme in master area/Reservoir Sector 65, 51 & 35, Noida, Role: PI, Funding agency: New Okhla Industrial Development Authority, Noida, India. (Ongoing)
Site visit, vetting and verification of the Topography and Contour Survey Report of Solar EPC Project at Khavda, Gujarat, Role: PI, Funding agency: Dineshchandra R. Agrawal Infracon Pvt. Ltd (DRAIPL), Gurugram, India. (Ongoing)
Preparation of the estimate for the infrastructure development of EMC Sector-10, YEIDA, Uttar Pradesh, Role: PI, Funding agency: Design Associates Inc., India. (Ongoing)
Detailed Project Report of Development, Procurement and Construction Assistance of Sewage Treatment Plant of Capacity 20+20=40 MLD in Sector-24 A (Zone- II), YEA, Role: PI, Funding agency: Yamuna Expressway Industrial Development Authority, UP, India. (Ongoing)
Strengthening of Tertiary Treated Water Supply System & Laying of T. T. Water Lines in Left-Out Areas, Chandigarh, Role: PI, Funding agency: Tirupati Cement Products, India. (Ongoing)
Development of an Indian Plastic Credit Framework for Plastic Recycling, Role: PI,Funding agency: Novuscom Global Private Limited, India. (Ongoing)
Availing the expert advice and technical guidance regarding the estimation for the construction of road, drain, and sewerage system of 7% abadi plot in village Ronija, YEA, Role: PI,Funding agency: Yamuna Expressway Industrial Development Authority, UP, India. (Ongoing)
Availing the expert advice and technical guidance regarding the estimation for the construction of a 120 m wide road, Ch. 8.48-10.48 km between sector-22D & 24, YEA, Role: PI, Funding agency: Yamuna Expressway Industrial Development Authority, UP, India. (Ongoing)
Availing the expert advice and technical guidance regarding the estimation for the construction of both side main carriageway of a 130 m wide road between Sector-10 & 5, YEIDA, Role: PI, Funding agency: Yamuna Expressway Industrial Development Authority, UP, India. (Ongoing)
Availing the expert advice and technical guidance regarding the estimation for the resurfacing of 18.00 m and 12.00 m wide road of 7% abadi plots in Sector-25, YEIDA, Role: PI, Funding agency: Yamuna Expressway Industrial Development Authority, UP, India. (Ongoing)
Availing the expert advice and technical guidance regarding the estimation for the C/o RCC Drain of 130 m wide road along Sec-21, YEA, Role: PI, Funding agency: Yamuna Expressway Industrial Development Authority, UP, India. (Ongoing)
Availing the expert advice and technical guidance for the preparation of the estimate for the proposed resurfacing work in Sector-20 (Pockets C, E & R), YEA, Role: PI, Funding agency: Yamuna Expressway Industrial Development Authority, UP, India. (Ongoing)
Availing the expert advice and technical guidance regarding the estimation for the construction of 24 m & 30 m wide road, drain & sewerage system in Sec-22E (Balance Work), YEA, Role: PI, Funding agency: Yamuna Expressway Industrial Development Authority, UP, India. (Ongoing)
Availing the expert advice and technical guidance regarding the estimation for the construction of the main carriageway (both side) of 100 m wide road between Sector-21 & 34, 35, YEA, Role: PI, Funding agency: Yamuna Expressway Industrial Development Authority, UP, India. (Ongoing)
Preparation of DPR and NIT for ETP of MSW plant, Role: PI, Funding agency: Greater Noida, India. (Ongoing)
Preparing site visit/inspection report and the DPR and NIT for the upgradation of 137 MLD STP in Greater Noida, Role: PI, Funding agency: Greater Noida, India. (Ongoing)
Preparation of DPR and NIT of decentralised STP, Role: PI, Funding agency: Greater Noida, India. (Ongoing)
Preparation of DPR and NIT of TTP for 15 MLD, 20 MLD & 137 MLD STP, Role: PI, Funding agency: Greater Noida, India. (Ongoing)
Preparation of DPR and NIT for producing fertilizer from STP sludge, Role: PI, Funding agency: Greater Noida, India. (Ongoing)
Preparation of DPR and NIT for the operation & maintenance work of 137 MLD STP, including MPS for 60 months at Kasna, Greater Noida, Role: PI, Funding agency: Greater Noida, India. (Ongoing)
Preparation of Quantitative Risk Assessment report for Okhla RNG Plant, Role: PI, Funding agency: M/s Okhla RNG Pvt. Ltd., Haryana, India. (Completed)
Eco-toxicity testing of Niletreat, Role: PI, Funding agency: Niletech Infrabuild (OPC) Private Limited, India. (Completed)
Determination of the waste handling capacity of the material recovery facility of Delhi Airport, Role: PI, Funding agency: Delhi International Airport Limited, New Delhi, India. (Completed)
Environmental studies at Floating solar PV(FSPV) projects, Role: Co-PI, Funding agency: NTPC Limited, Noida, India. (Completed)
Integrated Approach to Pond Rejuvenation for Sustainable Ecosystems, Role: PI, Funding agency: Max Healthcare Foundation, India. (Completed)
Regulatory Environmental Audit and Report Preparation for Common Hazardous Waste Treatment Storage and Disposal Facility, Role: PI, Funding agency: Re Sustainability Limited, Odisha, India. (Completed)
Environmental Audit of CHW-TSDF, Rajasthan Waste Management Project, A Division of Re Sustainability Limited and its Operations, Role: PI, Funding agency: Re Sustainability Limited, Rajasthan, India. (Completed)
Environmental Audit of CHW-TSDF, Punjab Waste Management Project, A Division of Re Sustainability Limited and its Operations, Role: PI, Funding agency: Re Sustainability Limited, Punjab, India. (Completed)
Environmental Audit of CHW-TSDF, Balotra Waste Management Project, A Division of Re Sustainability Limited and its Operations, Role: PI, Funding agency: Re Sustainability Limited, Rajasthan, India. (Completed)
Providing Drinking Water to Bhabua and Mohania Town Under Jal-Jeevan-Hariyali Abhiyan on Turn Key Basis by Utilizing Water Technical Review of Design and Drawings, Role: Co-PI, Funding agency: SEPC Limited, Bihar, India. (Completed)
Testing the characteristics of wastewater of the drain near SLF Bhalswa, Delhi, Role: PI, Funding agency: Municipal Corporation of Delhi, India. (Completed)
Inspection of Grossly Polluting Industry (GPIs) for the year 2024, Role: Co-PI, Funding agency: Central Pollution Control Board (CPCB), India. (Completed)
Inspection of Grossly Polluting Industry (GPIs) for the year 2023, Role: Co-PI, Funding agency: Central Pollution Control Board (CPCB), India. (Completed)
Site-Visits, and Professional Guidance on Machine Wound Spiral Lining (MWSL) Design, Condition Assessment Survey of Sewer-Line Network, and Sewer Desilting Methodology for Rehabilitation of Sewer Line Works with Trenchless Technique in the Jaipur Walled City Area in Rajasthan, Role: Co-PI, Funding agency: Ashwath Infratech Pvt Ltd, India. (Completed)
Expert Advice and Guidance on Design and Drawings of the RCC Structures: (i) Sump Cum Pump House at Marine Hill, Malai Bijon, and Police Line, (ii) SCADA Building at Buniyadabad, (iii) Chlorinator Room at Police Line and Buniyadabad, (iv) Pumping Station at IPS-1 Locations and Design of New Sewer Line Network Stretch of Around 38 km at Port Blair, India, Role: Co-PI, Funding agency: SHRISTI-KRUSHI-GKR JV, India. (Completed)
Process calculation, hydraulic flow and diagrams, check layout plan and drawings for 1.5 MLD, 3.6 MLD and 6 MLD Sewage treatment plant, Role: Co-PI, Funding agency: S S Engineering Works Limited, India. (Completed)
Vetting the Design and P&ID of STP of 2400 KLD for CPWD, Role: PI, Funding agency: ITD Cementation India Limited, India. (Completed)
Vetting the Basic Engineering Package (BEP) of 11.50 MLD STP and 29.50 MLD tertiary treatment plant at Nashik, Role: PI, Funding agency: M/s. Aquatech Solutions Pvt. Ltd., India. (Completed)
Vetting of designs and drawings of disc filters of STPs, Role: PI, Funding agency: I-Enable Exim Services Pvt Ltd, India. (Completed)
Vetting of 50 MLD (Phase 1 and Phase 2) STP at Salawas Jodhpur, Role: PI, Funding agency: Enviro Infra Engineers Ltd., India. (Completed)
Vetting of designs and drawings of 43 MLD STP at Salori, Prayagraj, Role: PI, Funding agency: HNB Engineers Private Limited, Noida, India. (Completed)
Vetting of STP Treated Water Line in Sewerage District-D, Role: PI, Funding agency: New Okhla Industrial Development Authority, Noida, India. (Completed)
Vetting of Concept Proposal for Sewerage Development Plan, Faridabad, for Master Plan-2031, Role: PI, Funding agency: Faridabad Metropolitan Development Authority, Haryana, India. (Completed)
Vetting of Balance Designs and Drawings of Farrukhahad Fatehgarh Project, Role: PI, Funding agency: HNB Engineers Private Limited, Noida, India. (Completed)
Vetting of designs and drawings of 20 MLD STP at Zone D, Sector 29 YEIDA, including all other related drawings, Role: PI, Funding agency: HNB Engineers Private Limited, Noida, India. (Completed)
Vetting of designs and drawings of tertiary treatment plant (TTP) at various locations in Noida, Role: PI, Funding agency: HNB Engineers Private Limited, Noida, India. (Completed)
Preparation of Organic Waste Strategy and Enabling Framework for Maximized Recycling for Climate Mitigation and Achieving Circular Economy Models in Delhi, Estimating methane emission and related footprint, Role: PI, Funding agency: IPE Global Ltd., New Delhi, India. (Completed)