Season 2024-25
Purchase of new benches for the perimeter of the park
Replacement of the bridge hand railing
Replacement of wood on the stationary benches
Cleaning and replacement of bulbs in the sidewalk lighting
Installed new white lights on Broadway wall
Season 2023-24
Mural Painting added to the Memorial Garden
New Gravel for the Memorial Garden
Hand-painted patio stones for Memorial Garden
Purchased and installed small fire hydrants
Season 2022-23
Replacement of the gate latch on the center gate between the north and south basins (facilitating not having to lift the latch to enter and exit)
Modification of the exit gate latch
Stepping stones for ease of accessing poop bags at the entrance.
Updated the lights along the walkway walls.
Season 2020-21
Tuff Shed installed on-site (paid for by several donors)
Blue curb markers (CM's) painted on sidewalk curb
New storage totes (paid for by a single donor)