Thanks for visiting our new site! If you are here for applications, please use the "Applications" button on the top right.
Welcome to our news page! You can find all the latest news about the group under this page. Sorted from newest to oldest.
Written on: February 9th 2024 @ 10:00am EST
The Line 2 Revitalization Project is finally finishing after multiple delays and other projects releasing. Let's outline the new updates that'll be in the revitalization project.
6 car compatability
All stations and signaling has been refitted for 6 cars to fit in them
Time reduction (it now takes slightly less time to get from Kipling to St George)
New track placement in some sections
New scenery at Kipling (the station itself is pending completion)
Signaling system refresh
Control room refresh
Small station revamps
Line only goes from Kipling to St George, the rest of the line has been phased out and removed
Removal of H6
More work zones throughout the line as we prepare more sections of tracks to be smoother
Written on: March 20th 2023 @ 1:30pm EST
To help save our aging subway divisions and prepare for our new subway chassis, we're revamping one of the biggest divisions we've made which is Line 2. During the revitalization period, portions of the line may be shut down, or some stations may be closed but the division can still be used. This revitalization project includes refreshing and revamping the infrastructure in stations and the systems in the line such as signaling or crossovers. Stations will be made to fit 6 car vehicles as we move forward to upgrading and providing the most realistic subway chassis found in the North American Ro - Transit community.
Signaling upgrades and some crossover upgrades are expected to be finished on March 23rd, and track work along with station infrastructure revamps will start on the 24th of March. There's currently no estimate date when this project will end.
Written on: March 7th 2023 @ 9:00pm EST
Say hello to our newest division! This division is fully fictional apart from some station designs and trains. We're using our two newest vehicles the Toronto Rocket and the Tokyo Metro 18000 Series, both equipped with a newer and more realistic chassis! We don't have a estimate date of release but we aim to finish this project near the end of Spring 2023! This division features 3 separate lines which are:
Line 6 Carrington Line
Line 7 Meguro Line
Line 8 Sengoku Line
Each of these lines have different vehicles that run on them, Line 6 for instance has only Toronto Rockets running within the line. Line 7 and 8 share the same vehicles together, however Line 8 is only compatible with 6 car trains, while Line 7 is compatible with 10 car trains. All of these lines have their own yards for their fleet. The three yards in this division are: Greenwood Yard, Meguro Yard and finally Yotsuya Yard.
We hope you all love the final outcome of this project! A map is provided below so you can visualize how it's all going to look.