The TOP is far from an optimized model or design, but given the circumstances in which it was built, the project was a major success. My project timeline spans over the course of 16 weeks, and over half of those were during the Corona virus pandemic. The largest hurdle to get over during the pandemic was access to proper resources. Metal and wood working became far more difficult once the lock-down orders were put into place. Supply chains were slow in getting needed parts delivered, and the overall isolation made trouble shooting extremely challenging. It is hard to say exactly what the TOP would be without the pandemic, none the less the TOP accomplished what it had intended!