Ball Mill Calibration and Operational Tuning
Mechanical alignment and processing parameter configuration executed on the ball mill system following full installation to optimize primary ore milling efficiency.
Installation of Mineral Processing Slurry Pumps
Precision field assembly and pipeline integration of high-capacity slurry pumps within the gravity concentration plant framework.
Assembly of Patented Gravity Settling Equipment
On-site skid-mounting and technical layout adjustment of the multi-stage stepped settling sluice blocks on the alluvial mining field.
Equipment Assembly and Structural Commissioning
Heavy mechanical integration and structural steel frame erection of the modular beneficiation plant units before operational testing.
"Tenhleg Tataltsal LLC" manufactures highly advanced mineral processing plants for both primary and alluvial gold deposits. In addition, we deliver fully integrated, multi-stage professional engineering services directly to our clients and partner mining operations.
Plant Installation and Commissioning: We execute high-precision mechanical installation and field commissioning of all processing equipment strictly matching standard blueprints and technical safety protocols.
Professional Operator Services: Following structural installation, our technical team manages the field operation under precise technological flow configurations to guarantee a safe, continuous, and optimized slurry flow.
Workforce Training and Capacity Building: We provide comprehensive on-site technical training programs for the client’s engineers and operators, focusing on mechanical settings, gravity adjustments, and field safety.
Long-Term Maintenance Accountability: We provide continuous technical audits, structural system diagnostics, and mechanical maintenance over extended cycles to guarantee zero unexpected processing line downtime.
Metallurgical Consultation and Recovery Audits: We deliver expert engineering consultations to accurately isolate tailing losses, optimize overall gravity concentration hold, and maximize mine site management efficiency.
Anti-Freezing Engineering Interventions: To withstand harsh sub-zero temperatures, we install custom thermal insulation coatings and technology heat-tracing networks over core slurry settling units and processing pipes.
Disintegration of Frozen and High-Clay Matrices: Freezing weather severely hardens adhesive clay matrices. We resolve this by tuning our mechanical crusher settings and hydraulic high-frequency vibration configurations to cleanly shatter frozen gravel right within the slurry stream.
Closed-Loop Water Management Settings: We integrate water-conserving, fully closed-circuit water recycling loops that preserve heat within a tight loop, allowing continuous winter gold washing without reliance on frozen open-water reservoirs.
Extended Processing Season ROI: This extensive winterization package allows mines to run reliably during sub-zero months, expanding the active processing season by an additional 30 to 45 operating days for massive production gain.
Manufacturing Supply-Chain Partnerships: Moving forward, we are establishing official long-term partnerships with leading mining equipment manufacturers in China to mass-produce our proprietary patented gravity system designs under strict global quality controls.
Modular Block Assembly Framework: Heavy technical components will be manufactured overseas and delivered as specialized modular blocks to our base in Mongolia, where our engineering team executes final precision assembly and adjustments.
International Market Expansion: This supply-chain model will dramatically scale our production volume, allowing us to successfully export our eco-friendly green mineral technology into international mining markets worldwide.
Our technological and engineering calculations are fully verified under real mining conditions, based on the actual processing capacity of 3,000 m³ of concentrate material per day and the market gold price calculated at 350,000 MNT per gram (Exchange rate calculated at 1 USD = 3,450 MNT).
Proven Production Outcomes (78%–85% Metal Recovery Output): Industrial testing has verified that our system achieves high-performance recovery levels, maximizing direct mine site cash flows.
Grade-Dependent Daily Revenue Projections (USD $):
Low-Grade Deposits (0.1 g/m³): Generates $31,449 to $35,594 USD in daily revenue.
Medium-Grade Deposits (0.3 g/m³): Generates $94,115 to $106,521 USD in daily revenue.
Good-Grade Deposits (0.5 g/m³): Generates $156,869 to $177,739 USD in steady daily revenue.
Rapid Investment Payback Period: Because our system captures ultra-fine gold particles that traditional sluices completely lose, operators can fully recover their initial plant capital investment within just 10 to 15 operating days.
Operational Cost Savings: Since the process requires absolutely zero chemicals, mines completely eliminate the high expenses of transporting, storing, and neutralizing hazardous chemical elements, saving 100% of chemical management costs.