This was a collaborative initiative. We were given several structural health monitoring instruments to use, such as a rebound hammer, an ultrasonic pulse velocity machine, and a rebar scanner. We compared the findings after computing compressive strength using a rebound hammer and measuring compressive strength with a UTM machine.
Ultrasonic Pulse Velocity Test
Compressive Strength Test
Rebound Hammer Test
This was a solo initiative. I learned Autodesk Revit, Robot Structural Analysis, Autodesk Navisworks and Primavera P6 in this sessional course.
Robot Structural Analysis
Construction Scheduling
3D Model in Revit
This was a collaborative initiative. We had to design the interior of an existing structure of KUET (Central Computer Centre). We used AutoCad, Google Sketchup and Lumion to design this building.
Interior View of CCC KUET
Exterior View of CCC KUET
Stair Details of CCC KUET
This was a collaborative initiative. We had to study a high rise building. We have been given 432 Park Avenue of New York to study various features of this building.
3D Model of 432 Park Avenue
Poster Design
Structural Analysis
This was a solo initiative. We had to design a ten storied tall building by using ETABS and conduct structural analysis to economically sustain this structure.
Deformed Shape of Structure
SFD of Structure
BMD of Structure
This was a solo initiative. We had to design the working drawing of a provided structure and creating blueprints as per BNBC.
Floor Plan
Piling Details
Grade Beam Details