PRACTICAL CHECKLIST · By Super Load Calculator · 8 October 2026
Before creating a container load plan, prepare a cargo list that describes the handling units arriving at the dock. A product catalogue, invoice or total CBM figure may omit the packaging and handling details that determine whether the proposed load is usable.
This checklist focuses on the handover between the shipper, forwarder and loading team. The aim is a list that someone can check against the packed cargo without guessing.
Use a name or reference that the warehouse can match to a label on the packed unit. Group pieces only when their outer dimensions, gross weight and handling rules agree. Two pallets of the same product may need separate entries if their heights or overhangs differ.
Quantity: the count of packed handling units.
Outer dimensions: length, width and height, including the pallet, crate, wrapping and protrusions.
Gross weight: the weight of each complete packed unit.
Handling rules: permitted orientation, rotation, stacking and floor-only requirements.
Keep measurement units consistent and state them clearly. A list mixing centimetres and millimetres can look plausible while describing the wrong cargo. Do not substitute net product weight for the weight of the piece being loaded.
If a value is estimated, label it and assign someone to confirm it. Ask the packer for a measurable stacking limit rather than accepting “stackable” without explanation. Record which face must remain upright and whether a piece can be turned.
For irregular cargo, check whether a rectangular envelope is a useful description. Keep lifting points, fragile parts and protrusions in the operational handover. A rectangular model does not explain every shape or handling requirement.
Record when the cargo was measured and who confirmed it. Give the loading team the version used for the plan. If packaging changes, update the dimensions and weight before relying on the earlier result.
A short change note helps prevent confusion: identify the affected cargo type, describe what changed and state which plan replaces the previous one.
Reconcile the planned quantities against the packing list, including unplaced pieces.
Check door clearance and cargo orientation against the delivered equipment.
Review the arrangement and order with the team that will load it.
Record changes made at the dock and circulate the current version.
Only when the packed dimensions, gross weights and handling rules match. Separate unlike units so the plan does not assume they are interchangeable.
The website cargo-list tutorial explains the fields in more detail. You can view a visual container planning example or read about planning rectangular cargo in a container.
Cover artwork is illustrative. Confirm the actual cargo, equipment and securing separately before loading.
Will cargo fit in a container? Five checks beyond CBM — on our main website.
Container loading sequence: review the plan before the dock — on our main website.
For another presentation of this topic, read the Super Load Calculator article on Medium or the Substack article.
Follow Super Load Calculator: LinkedIn · X · Instagram
Published by Super Load Calculator, the maker of the planning tool linked in these guides.
Use our LinkedIn packed-cargo checklist when requesting complete details from your warehouse or supplier.