Funding required to commence the project is $650,000 and includes equipment, accessible surfacing and installation. Accessible surfacing, a critical component in making the playground accessible, represents 30% of the project budget. We anticipate breaking ground summer 2025 as long as funding needs are met.
While the playground will reside on the grounds of Stranahan Elementary, the playground will be accessible to the entire community. Wildwood MetroPark connects directly to the site and Sylvania Recreation baseball fields are adjacent to the site making it an ideal location for all to enjoy.
We intend to incorporate the 7 Principles of Universal Design (Center for Universal Design, 1997) into our play space in order to better meet the needs and abilities of all users. Principles include:
Equitable use
Ex. Swings (Traditional & Adaptive)
Flexibility in use
Ex. Ramp access
Simple & intuitive use
Ex. Easy to navigate
Perceptible information
Ex. Sensory panels
Tolerance for error
Ex. Safety features
Low physical effort
Size & space for approach & use
Ex. Appropriate space for assistive devices