Work areas:
Floor area 40000 sq. ft in total.
Scope of works:
Gypsum board false ceiling with paint finish, Tiles/Marble work, Brick work, Wall paint, Glass partition, Door work Wall and Colum cladding, Sanitary & Plumbing, Electrical works, AC works, Touch Screen Lighting control system, Carpet, Wireless LAN, Telephone & Dish Line work, ()()() Equipments, Fire Detection System & Furniture work etc.
100000 sft | floor area
1.47 core bdt | project cost
90 days | project duration
Ceiling & Wall Paneling | provided service
Floor area:
30000 sft
Project cost:
4.00 core bdt
Project duration:
180 days
Provided service:
Interior Decoration
25000 sft | floor area
1.37 core bdt | project cost
180 days | project duration
Fit-out | provided service
●Construction ● Interior fit out ● Trading ● Consultancy