Booster 7
@LunarCaveman Booster Diagram
7 Engine Fire on 9/19
8/9/22 Single Engine Static fire of B7
7/18/22 Removal and eventual replacement of all B7 Raptor Engines Begins
7/12/2022 B7 Inspections - Lift - Rollback to Build site - Extensive Repairs needed
7/11/2022 B7 Methane Spin Test Anomalies
6/23 Booster 7 rollout to the launch pad
6/23 Booster 7 loaded on OLM
6/10Booster 7 Engines installed x33
6/2 Grid Fins Installed on B7
5/14 B7 Rolled back to the WideBay
5/11 B7 Cryo Testing
5/6 B7 Loaded on OLM by Crane
4/25 B7 Leaves HighBay
4/18 B7 Leaves Launch Site for Build Site
4/14 B7 Tested on the can crusher bottom / max q tester thrust sim
4/2 B7 Lifted to OLP - no raptors
3/31 B7 Arrives at the Launch Site (first time)
Booster MaxQ Tester (Can Crusher) / Thrust simulator
3/25 B7 in HighBay
3/20 Triangular AeroCovers "Chines" Installed
3/10 B7 Fully Stacked
3/5 B7 LOX stacked on Thrust Section
2/13 B7 Methane Section moved to HighBay
1/23 B7 Methane stands 13 rings tall 9+4 - Complete
1/17 B7 Forward Dome stacked on 3 ring section
1/12 B7 Downcomer Installed
1/7 B7 LOX stacked to 20 rings tall
12/21/21 B7 Common Dome Stacked
10/25/2021 B7 Downcomer delivered