Booster 7

B7 Labeled!

@LunarCaveman Booster Diagram

7 Engine Fire on 9/19

8/9/22 Single Engine Static fire of B7

7/18/22 Removal and eventual replacement of all B7 Raptor Engines Begins

7/12/2022 B7 Inspections - Lift - Rollback to Build site - Extensive Repairs needed

7/11/2022 B7 Methane Spin Test Anomalies

6/23 Booster 7 rollout to the launch pad

6/23 Booster 7 loaded on OLM

6/10Booster 7 Engines installed x33

6/2 Grid Fins Installed on B7

5/14 B7 Rolled back to the WideBay

5/11 B7 Cryo Testing

5/6 B7 Loaded on OLM by Crane

4/25 B7 Leaves HighBay

4/18 B7 Leaves Launch Site for Build Site

4/14 B7 Tested on the can crusher bottom / max q tester thrust sim

4/2 B7 Lifted to OLP - no raptors

3/31 B7 Arrives at the Launch Site (first time)

Booster MaxQ Tester (Can Crusher) / Thrust simulator

3/25 B7 in HighBay

3/20 Triangular AeroCovers "Chines" Installed

3/10 B7 Fully Stacked

3/5 B7 LOX stacked on Thrust Section

2/13 B7 Methane Section moved to HighBay

1/23 B7 Methane stands 13 rings tall 9+4 - Complete

1/17 B7 Forward Dome stacked on 3 ring section

1/12 B7 Downcomer Installed

1/7 B7 LOX stacked to 20 rings tall

12/21/21 B7 Common Dome Stacked

10/25/2021 B7 Downcomer delivered