Deck built for a cottage in Colchester. Involved grading the dirt, preparing drafts of the design and executing the project.
We built a ramp for a cottage in Colchester. Involved creating a draft of the ramp, constructing it and executing the project!
Designed and crafted a leveller. It involved desiging, welding, fabricating and painting the leveller.
This is farm equipment. I used my fabrication and welding techniques to repair the equipment. Once the repairs were completed, I finished the project with a red paint job.
Restored a 1995 XJ Jeep in June, 2025. Some general work done on it included: undercoating the vehicle, sanding the old paint job, repainting the whole vehicle and welding new floor pans in.
The fence involved removing the old fence, designing a new fence, drilling the holes, building the fence and sprayed a coating on the fence.
Built a sandblasting cabinet. Involved designing the build, fabricating, welding and painting the cabinet.
Full restoration of a 1989 Ford pickup truck. This restoration involved sandblasting, grinding, full paint job and undercoating of the vehicle.
Design, built and stained a fence. Built in under 3 days. Drilled holes, levelled the ground, put the posts in, holes filled with concrete, put all the fence boards up and finally stained the boards.
Fully restoration of a dually GMC truck.