Installed a new window for the kitchen, replaced the wood around the frame, installed new drywall. new countertop, sink faucet, new appliances, new flooring, new baseboards. new light fixtures and painted the walls.
Refaced a deck in Stoney Point. Ecstatic customers!
The fence involved removing the old fence, designing a new fence, drilling the holes, building the fence and sprayed a coating on the fence.
Deck built for a cottage in Colchester. Involved grading the dirt, preparing drafts of the design and executing the project.
We built a ramp for a cottage in Colchester. Involved creating a draft of the ramp, constructing it and executing the project!
Design, built and stained a fence. Built in under 3 days. Drilled holes, levelled the ground, put the posts in, holes filled with concrete, put all the fence boards up and finally stained the boards.
Repaired, drilled new posts, and power washed a fence in Windsor.
Designed a new deck for a customer. New braces, new boards, and new wire for the railing.
Fabricated, built, and finished a barn to use for a hottub! Custom siding was put on the barn.
Our team painted this c-container for a local business. Not only was the customer happy, but the c-container looks fresh and new!
Repaiting the wood on the entrance to a garage for a client. Super happy with the results! Looking brand new again.
Designed and crafted a leveller. It involved desiging, welding, fabricating and painting the leveller.
This is farm equipment. I used my fabrication and welding techniques to repair the equipment. Once the repairs were completed, I finished the project with a red paint job.
Grinding the rust off. Welding new rocker and metal patches onto body. Sand and paint.
Design, fabricated and executed a hitch for a 2007 G-Wagon
Restored a 1995 XJ Jeep in June, 2025. Some general work done on it included: undercoating the vehicle, sanding the old paint job, repainting the whole vehicle and welding new floor pans in.
Full restoration of a 1989 Ford pickup truck. This restoration involved sandblasting, grinding, full paint job, bedliner, and undercoating of the vehicle.
Buffed and waxed a 29.4ft Amberjack Sea ray.
Designed, built and installed a swinging door for Pharamasave Tilbury.
Took the old broken concrete out and poored new concrete for a flag pole.