Club house

2019-04-09

Roadbed in cork was glued to the EUR-level starting after the loop in the first room.

The roadbed continued along the short side in the first room.

The roadbed continued until the first short side in the second room.

Modules of the EUR-level went all the way to the second short side of the second room. A previously built corner module was hung on the wall while waiting for renovation.

2019-04-06

Support beam mounted as support for modules that leave the support of the walls.

The support beam assists modules for both levels.

Two straight modules were made between Willie Yard and the left corner.

Many modules ended up in their correct locations.

Overview of the second room with modules. From the right, the modules extend from the first room where the EUR-level loop is located.

2019-04-04

Y-module for the EUR-level loop in place.

All modules for the loop in place.

2019-04-02

Two straight modules were manufactured.

The collaboration worked great ... some thought.

After good cooperation, it was a good result.

Modular frame grinding contributed to good fit.

EUR-level loop module was manufactured.

Check the level of Canyon Loop.

Temporary leg as support during adjustment.

Adjustment of attachment.

Fixing the Canyon Loop was completed.

Canyon Loop adjusted a few centimeters.

The landscape is not parallel to the wall.

Parts of the landscape were removed.

The landscape was parallel to the wall.

Background tested for Canyon Loop.

2019-03-26

Discussions and planning were carried out.

The result of the planning was happening.

2019-03-23

Corner modules for the EUR-level loop were put in place.

Corner modules for the EUR-level loop were put in place.

2019-03-19

Recycling boxes were created.

Corner modules for the EUR-level loop were manufactured.

An assortment cabinet.

Another assortment cabinet that left the club house.

2019-03-02

Corner modules were manufactured.

Canyon Loop with connecting module at US-level was temporarily put in place.

Canyon Loop with connecting module at US-level was temporarily put in place.

Modules that were not used were placed on the walls.

Unique module got unique storage location.

City module had to remain in its temporary place.

2019-02-26

Canyon Loop has moved up from EUR-level to US-level (top layout).

2019-02-16

A straight module was manufactured.

Modules on the EUR-level. Last picture of Canyon Loop placed on EUR-level.

2019-02-05

Modules for passage between the rooms were manufactured.

2019-01-29

First modules on EUR-level (lower layout) in place.

Modules on the EUR-level.

2019-01-22

Corner modules were manufactured.

2019-01-15

Corner modules were sanded.

Corner modules were manufactured.

2019-01-08

Corner modules were manufactured.

2019-01-05

Corner modules were manufactured.

Sawing of material was performed.

2019-01-01

This year's first day with full activity at the club. Sawing of material was performed. Corner module was manufactured.

----- 2019 -----