Planning and completing a bushcare task is satisfying in itself. This very front section of the site needed to be tidied up and made safe from swift water flooding. Mulch matting was secured in a trench before a final tidy up.
Camphor Laurel chip pile: potential flood hazard at front of site
Mulch Mat Roll-out: Leading edge secured in back-filled trench against swift flood flow
Satisfaction of a job well done