The Mole
The Mole (seawall) was built to create a harbour around the canal entrance. A viaduct carried a railway track and the electricity supply to the Mole and a light house was constructed at the far end
The canal entrance in 1908 with the newly completed Mole in the background
Zeebrugge stands at the end of the canal connecting Bruges with the North Sea
The lock gates at the entrance to the canal
The railway line running along the viaduct to the Mole
The Viaduct connecting the Mole to the mainland
The lighthouse at the end of the Mole -1998