This document provides the process for Infrastructure and Environment.
This document covers the procedure for the practices that must be followed for compliance of ISO13485
(Version at end of page)
Signed V8 ML 15.10.2024
The process covers all documents and process and products as defined in the SOP
Approval: Author of the document, Monica Lucas
Changes: Logistics Manager/General Manager
Infrastructure - building, lights, floors, windows, perimeter, equipment relevant to the operations / SHEQ
Environment - the working condition appropriate to GMP / requirements of the product e.g. cleanliness, storage conditions
GMP - Good manufacturing, distribution, storage, stock management practices
SHEQ - Safety, Health, Environment and Quality
NCCA – Non Conformance Corrective Action
SOP – Standard Operating Procedure
ISO13485 Clause 6.3 & 4
SOP Non-Conformance, Deviations and Concessions & Corrective Action
Note areas related to CLEANLINESS are 1. Office (and thoroughfare), 2. Decontamination Area, 3. Store, 4.Logistics/Warehouse Area
Werkomed CPT
Hygiene Areas
The facility is mainly a warehouse with non temperature sensitive devices
The Implants are located in an cool environment with no special temperature control & monitoring requirement
The Decontamination area in a cool environment has no special temperature control & monitoring requirement
Under Infrastructure and Environment the organization provides requirements for the maintenance activities, including the interval of performing the maintenance activities, when such maintenance activities, or lack thereof, can affect product quality. As appropriate, the requirements apply to equipment used in operation, the control of the work environment and monitoring and measurement and records of such maintenance are maintained.
Work environment and contamination control follows above however if any maintenance, or preventative maintenance of furnishings, fittings or equipment is required, then it is to be reported to the General Manager or Warehouse Manager in order for the maintenance to be arranged.
This preservation includes identification, handling, packaging, storage, and protection and also applies to the basic parts of a product
Supplier are approved by SOP External Providers
Preventive maintenance activities include equipment , vehicles, computers, facility checks by management on a regular basis. The ideal preventive maintenance program would prevent all equipment failure before it occurs.
Maintenance requirements: -
In the event of and non conformance finding then SOP Non-Conformance, Deviations and Concessions & Corrective Action SOP is followed
In the event of non compliance follow SOP NON CONFORMANCE CORRECTIVE ACTION
The Risk Assessment to is found in SOP PREVENTIVE ACTION RISK ASSESSMENT refer Document
An analytical review is reported monthly to management and this forms part of the input through Data Analysis to management review
The Trend should pick up any potential and recurring incidents, where corrective action must be reported at the management review to facilitate continual improvement.
Revision 8; 15.10.2024 - ML - Checked and Confirmed. Digitally signed by ML
Revision 7; 09-10-2024 - CR - Uploaded KZN Office floor plan
Revision 6; 22.11.2023 - ML - Checked and Confirmed. Digitally signed by ML
Revision 5; 22.11.2023 - CR - Updated Hygiene Area picture, 8.1 Infrastructure & Environment; & Updated General Layout
Revision 4; 27.10.2023 - PM - Updated floorplan for Gauteng office
Revision 3; 07.11.2022 - ML - Updated and Checked. Digitally signed by ML
Revision 2; 07.10.2021 - ML - Digitally signed by ML
Revision 1; 10.05.2021 - ML - Digitally signed by ML
Revision 7, 30.04.2021 - TNA - New format with Approval / Scope /Responsibilities, Risk based approach and Records and revision history added and new googlesite format. Amending links and Forms
Revision 6, Digitally signed on 04.11.2020 by NH
Revision 1-5, unknown due to googlesite change to new googlesite
Name Retained by/ in Retention period Hard copies Destroyed by
None n/a n/a n/a