C.1. Approved building plan, showing the location of the different buildings on the campus
C.2. Evidence that electrical lines are safely installed and periodically checked
C.3. Schedule of water potability testing and pest control inspection
C.4. PDF of the janitorial staff, including the work schedule
AREAS UNDER SURVEY