Consultancy Projects Summary

25. Computational Fluid Dynamics Study for bottom slab orifices in two upstream surge shafts and downstream surge shafts in Tehri PSP. [Completed]

26. Determining the safe distance for sand mining from the laid Oil and Gas pipeline crossing the Son river bed. [Completed in 2022]

27. Review/ Proof checking of Hydrological and Hydraulics analyses included in Detailed Project Report of Boundary wall at Reliance Jamnagar. [Completed]