Road Updates
This are copied from Bram Towbin's Updates shared on Facebook and Front Porch Forum
Disaster Declaration Declared 8/20/24
This are copied from Bram Towbin's Updates shared on Facebook and Front Porch Forum
Click link for before & after pics: https://plainfieldvt.wpcomstaging.com/2024/07/18/july-18-am-road-report-plus-before-and-after-pics/
One of the road crew was injured by a reckless driver on East Hill Road. The person slammed into the backhoe bucket at great speed, then fled the scene with his vehicle spraying coolant everywhere. The road crew member is hoping to return next week. But, obviously, his recovery is the top priority. He was in the cab at the time facing the opposite direction at the time. The State Police are looking for the driver, who has been identified. PLEASE EXERCISE CAUTION WHEN DRIVING ON ANY OF OUR ROADS AS THERE ARE MANY CREWS OUT DOING REPAIRS.
THESE ROADS ARE IN THE PRELIMINARY STAGES OF RECOVERY. LOCAL TRAFFIC OR WORK VEHICLES ONLY.
Rec Field Road - The washout is being addressed but still not passable. Hopefully by Friday.
Mill Street Bridge in Village – temporary bridge structure has arrived. Assembly and placement are the next steps. Look to mid to late next week for a passable corridor.
LOWER ROAD – NO ACCESS TO BARRE TOWN, TAKE MIDDLE ROAD
ROUTE 2 – now open to one lane traffic. [website moderator updated this from Bram's original road report]
MAXFIELD ROAD – LOCAL CONTRACTOR HAS CUT A PATHWAY VIA ADJACENT FIELD. THANKS TO THE LANDOWNER FOR GIVING PERMISSION
BROOK ROAD – STILL MAJOR CLOSURES IN VARIOUS DIRECTION. THE BRIDGE AFTER CAMERON ROAD GOING OUT OF TOWN HAS ONE LANE FOR WORK CREWS ONLY. DO NOT GO BY BARRIER. VERY DANGEROUS.
GONYEAU ROAD – BAD EROSION ON SIDES, PROCEED WITH CAUTION
WATER/WASTEWATER – MORE WATER RESTORED
GRAY ROAD - Erosion on either side has been addressed.
US-2 in Plainfield between Coburn Road and VT-214 is now OPEN to one lane of traffic.
Before and After Pictures" https://plainfieldvt.wpcomstaging.com/2024/07/16/july-16-am-road-update/
THESE ROADS ARE IN THE PRELIMINARY STAGES OF RECOVERY. LOCAL TRAFFIC OR WORK VEHICLES ONLY. THE PURPOSE OF THE UPDATE IS TO INFORM THE TAXPAYER OF PROGRESS THE TOWN IS MAKING AND TO HELP RESIDENTS
Brook Road Bridge in Village – open to single lane traffic – this is very significant as there will be a return to being able to travel from one side of the village to another without a 35 minute car detour
Mill Street Bridge in Village – we are facing some delays and it looks like it will be open early next week.
LOWER ROAD – NO ACCESS TO BARRE TOWN, TAKE MIDDLE ROAD
ROUTE 2 – CLOSED FROM COUNTRY CLUB ROAD TO ROUTE 214
REC FIELD ROAD – CLOSED
MAXFIELD ROAD – THERE HAS BEEN WORK DONE BY LOCAL RESIDENTS….
LEE ROAD – OPEN SINGLE LANE AT BOTTOM
BROOK ROAD – SINGLE LANE TO CAMERON ROAD
CAMERON ROAD BRIDGE – SINGLE LANE
BROOK ROAD – STILL MAJOR CLOSURES IN VARIOUS DIRECTIONS
CAMERON ROAD FROM VILLAGE – SINGLE LANE FOR WORK TRUCKS TO ACCESS TOWN GARAGE. NO ACCESS OVER CAMERON ROAD BRIDGE
BROOK ROAD ON ORANGE TOWN LINE – BRIDGE OPEN, SINGLE LANE.
BEAN ROAD – OPEN SINGLE LANE
GONYEAU ROAD – BAD EROSION ON SIDES, PROCEED WITH CAUTION
GORE ROAD – OPEN SINGLE LANE
WATER/WASTEWATER – SOME WATER RESTORED TO CUT OFF AREAS.
THESE ROADS ARE IN THE PRELIMINARY STAGES OF RECOVERY. LOCAL TRAFFIC OR WORK VEHICLES ONLY. THE PURPOSE OF THE UPDATE IS TO INFORM THE TAXPAYER OF PROGRESS THE TOWN IS MAKING AND TO HELP RESIDENTS
LOWER ROAD - NO ACCESS TO BARRE TOWN, TAKE MIDDLE ROAD
ROUTE 2 - CLOSED FROM COUNTRY CLUB ROAD TO ROUTE 214
REC FIELD ROAD - CLOSED
MAXFIELD ROAD - WILL BE WORKING ON MONDAY TO FORMALLY OPEN. THERE HAS BEEN WORK DONE BY LOCAL RESIDENTS….
LEE ROAD - OPEN SINGLE LANE AT BOTTOM
BROOK ROAD - MAJOR CLOSURES IN VARIOUS DIRECTIONS SOME BRIDGES HAVE BEEN RESTORED.
CAMERON ROAD FROM VILLAGE - SINGLE LANE FOR WORK TRUCKS TO ACCESS TOWN GARAGE. NO ACCESS OVER CAMERON ROAD BRIDGE
MILL STREET BRIDGE - TEMP BRIDGE STRUCTURE ARRIVES ON MONDAY - WILL TAKE A COUPLE OF DAYS TO SET UP.
BROOK ROAD ON ORANGE TOWN LINE - BRIDGE OPEN, SINGLE LANE.
BEAN ROAD - OPEN SINGLE LANE
GONYEAU ROAD - BAD EROSION PROCEED WITH CAUTION
GORE ROAD - OPEN SINGLE LANE
WATER/WASTEWATER - WORKING HARD TO RESTORE SERVICE TO MILL, BROOK, CREAMERY, BARRE HILL ROAD. WILL HAVE UPDATES EARLY IN WEEK.
Photo is of the Water Department working on Sunday on Brook Road.