District: Bywater - Full Control
Owner: CJG Property Management Group LLC
HDLC Staff: Dennis Murphy
Rating: Contributing
Applicant: Zach Smith Consulting
Permit #: 24-24383-HDLCÂ
Description: Renovation of an existing Contributing rated, two-story, two-family residential building including installation of new visible exterior rear stair.Â
Previous ARC Recommendations:Â
08/20/24: The ARC voted to defer the application for additional review. The ARC agreed that:
The ideal solution would be to integrate the required egress stair at the building interior; however, this may not meet SHPO/NPS approval requirements. If this is not feasible, the applicant should explore alternative options and strategies that reduce the overall size and visibility of the stairs and provide more of a sense of visual enclosure.
The current proposed stair appears too consistent with the existing building and may potentially be confused as a historic element rather than a modern addition. The design and materials should be further refined so it reads more as a new and contemporary element.Â
The applicant should consider reducing the depth of the 2nd floor landing and roof covering and utilizing a cantilever condition rather than post-supported.
The applicant should consider some permanent screening strategies, and is encouraged to provide a few options for the next ARC review.
The architectural expression and treatment of the new stair (and screening) should be simpler and more contemporary, and the applicant should consider utilizing similar materials and punched openings as the adjacent proposed new cabana accessory.Â
The applicant could consider shifting the stair on the rear elevation so that it is not symmetrically aligned with the main building to further emphasis it is a new and distinct element.
The applicant should contact the SFM to confirm if the stair width can be reduced from 4’-0” to 3’-0” to decrease the overall depth/size of the staircase.
The applicant should continue to work with SHPO/NPS and should provide them with several options for additional review and feedback before the next ARC review meeting so the two reviews can be more closely coordinated.