The student will mark the location of the studs on the top and bottom plates of the residential wall during week #6.
The student will then begin framing the wall by inserting and nailing the two end studs to form a rectangle,
or the outline of the wall.
Kit includes:
pre-cut wall pieces (top and bottom plates, 12 studs, 4 jack studs, sill plate, 2 headers and 3 cripple studs) and nails.
Student will need to supply:
yard stick or ruler or tape measure, hammer, an item to serve as a square and possibly a side cutter to remove problem nails.
Watch this video if you want to see the wall project demonstrated from beginning to end.