This project was to hide all the brick from a previous addition and to remove the fireplace in the family room, to move the laundry from off the family room and bring the floor to the height of the house floor and update the bathroom. The final touches on this project was skip trowel texture, modern Craftsman trim finishes, 30'x30' floor tile in the laundry/bathroom, and green subway tile soldier stacked with black grout.