[17] Vet the design engineering drawing of 'Dry fog dust suppression system' (Mechanical/hydraulic and electrical) of NCL india limited, Neyveli.
Funded by : Intigrated Engineering Works
Project No : IEW/CE/F070/2024-25/C1434
Role : Principal Investigator
Project cost :1,07,380/-
Project period : 1 Months
Status : Ongoing
[16] Electrical Resistivity Testing (ERT) at main divider bund of lagoon-2 in ash dyke of NTECL.
Funded by : NTPC Tamilnadu Enery co. LTD.
Project No : NTECL/CE/F070/2024-25/C1392
Role : Principal Investigator
Project cost :4,60,200/-
Project period : 1 Months
Status : Completed
[15] Carrying out surge Analysis for Karne Thanda lift irrigation scheme,
Funded by : Tudi Infrastructure
Project No : TUDI/CE/F070/23-24/C-1231
Role : Principal Investigator
Project cost :3,06,800/-
Project period : 1 Months
Status : Completed
[14] Carrying out surge Analysis for RM1 & RM2 SJKLIS, Dhule Maharastra.
Funded by : HVEL-Malaxmi & SEW-Prasad & Soma Joint venture
Project No : HVEL/CE/F070/23-24/C-1187
Role : Principal Investigator
Project cost : 6,13,600/-
Project period : 1 Months
Status : Completed
[13] Investigation of Seepage issue in ash dyke reservoir from IITH scientist at NTPC kudgi
Funded by : NTPC Kudgi
Project No : NTPC Kudgi/CE/ F017/2022-23/C-998
Role : Co-Principal Investigator
Project cost :18,88,000/-
Project period : 2022 (6 Months)
Status : Ongoing
[12] Vet The design engineering drawing of 'dust suppression system' (Mechanical/hydraulic and electrical) for: Singareni collieries, OC-3 Ramagundam, and KCHP manuguru
Funded by : Intigrated Engineering Works
Project No : IEW/CE/F070/2022-23/C976
Role : Principal Investigator
Project cost : 1,91,750/-
Project period : 2022 (30 days)
Status : Completed
[11] Storm water management plan for the Natco Pharma Campus in Mekaguda.
Funded by : Natco Pharma limited Hyderabad
Project No : NPL/CE/F070/2021-22/C723
Role : Principal Investigator
Project cost : 2,76,120/-
Project period : 2022 (15 days)
Status : Completed
[10] Third Party Evaluation of Polavaram Irrigation Project.
Funded by : Polavaram project Authority (central Govt)
Project No : PPA/CE/F070/2021-22/C609
Role : Principal Investigator
Project cost : 22,42,000/-
Project period : 2021 (3 months)
Status : Completed
[9] Investigation into the cause for water Oozing/Blister formation in the short Runway(SR), And Correction Measures.
Funded by : Garrison Engineer Project Air Force Academy Hyderabad
Project No : AIRFORCE/CE/F070/2020-21/C432
Role : Principal Investigator
Project cost : 9,20,400/-
Project period : 2020 (30 Days)
Status : Completed
[8] Study on Surface-Ground Water interaction to Develop a Comprehensive Hydrogeological Framework to Mange Groundwater Resource in an Over Exploited Ground Water assessment Unit.
Funded by : Ground Water Department, (TSGWD)
Project No : TSGWD/CE/F070/2019-20/C256
Role : Principal Investigator
Project cost : 20,00,000/-
Project period : 2019
Status : Ongoing
[7] Area based development (ABD) and the proposed pilot road (R-22) of 25 km length located within the ABD of the Ujjain Smart City Project.
Funded by : Tata Projects Limited
Project No : TPL/CE/F070/2018-19/C182
Role : Principal Investigator
Project cost : 32,42,000/-
Project period : 2018 (6 months)
Status : Completed
[6] Providing technical support for the project ‘Rehabilitation and Revitalization of the Bidar Karez.
Funded by : Indian Heritage Cities Network Foundation (Bidar District Administration)
Project No : BDA/CE/F064/2016-17/C4
Role : Principal Investigator
Project cost : 13,26,000/-
Project period : 2016 (3 months)
Status : Completed
[5] Study of Flow Measurements at Four Locations.
Funded by : Environment Protection Training & Research Institute
Project No : IC/CE/2015-16/089/EPTRI/KBVN
Role : Principal Investigator
Project cost : Rs. 1,48,850/-
Project period : 2016
Status : Completed
[4] Study and operation of Raw Water Pipe line with varying draw down levels of fore bay at pumping station 1 and its impact on the pipe line.
Funded by : KSK Water Infrastructures Private limited
Project No : IC/CE/2015-16/079/KSK/TS
Role : Co- Principal Investigator
Project cost : Rs. 4,10,000/-
Project period : 2015
Status : Completed
[3] Study and operation of Raw Water Pipe line with varying draw down levels of fore bay at pumping station 1 and its impact on the pipe line.
Funded by : KSK Water Infrastructures Pvt Ltd
Project No : IC/CE/2014-15/62/KSK/TS-KBVN
Role : Co- Principal Investigator
Project cost : Rs. 10,95,510/-
Project period : 2014 (4 months)
Status : Completed
[2] Intermediate Reservoir (IR) Dam Break Analysis, Flood Routing and Third Party Inspection.
Funded by : KSK Water Infrastructures Pvt Ltd
Project No : IC/CE/2013-14/047/KSK/IITH/KBVN
Role : Principal Investigator
Project cost : Rs. 26,29,224/-
Project period : 2014 (4 months)
Status : Completed
[1] Digital Hydro-Geologic, Groundwater Quality Modeling and Technical Support to SuGWM Project actions.
Funded by : Center for World Solidarity (CWS), Secunderabad
Project No : IC/CE/2012-13/015/IITH/KBVNP