Consultancy Projects

[17] Vet the design engineering drawing of 'Dry fog dust suppression system'      (Mechanical/hydraulic and electrical) of NCL india limited, Neyveli. 

        Funded by       : Intigrated Engineering Works

            Project No      : IEW/CE/F070/2024-25/C1434

Role                  : Principal Investigator

        Project cost     :1,07,380/-

        Project period : 1 Months

        Status              : Ongoing 

[16] Electrical Resistivity Testing (ERT) at main divider bund of lagoon-2 in ash dyke of NTECL.

        Funded by       : NTPC Tamilnadu Enery co. LTD.

            Project No      : NTECL/CE/F070/2024-25/C1392

Role                  : Principal Investigator

        Project cost     :4,60,200/-

        Project period : 1 Months

        Status              : Completed 

[15] Carrying out surge Analysis for Karne Thanda lift irrigation scheme,

        Funded by       : Tudi Infrastructure 

            Project No      : TUDI/CE/F070/23-24/C-1231

Role                  : Principal Investigator

        Project cost     :3,06,800/-

        Project period : 1 Months

        Status              : Completed 

[14] Carrying out surge Analysis for RM1 & RM2 SJKLIS, Dhule Maharastra.

        Funded by       : HVEL-Malaxmi & SEW-Prasad & Soma  Joint venture

            Project No      : HVEL/CE/F070/23-24/C-1187

Role                  : Principal Investigator

        Project cost     : 6,13,600/-

        Project period : 1 Months

        Status              : Completed

[13] Investigation of Seepage issue in ash dyke reservoir from IITH scientist at NTPC kudgi

        Funded by       : NTPC Kudgi

            Project No      : NTPC Kudgi/CE/ F017/2022-23/C-998

Role                  : Co-Principal Investigator

        Project cost     :18,88,000/-

        Project period : 2022 (6 Months)

        Status              : Ongoing 

[12] Vet The design engineering drawing of 'dust suppression system' (Mechanical/hydraulic and electrical) for: Singareni collieries, OC-3 Ramagundam, and KCHP manuguru

        Funded by       : Intigrated Engineering Works

            Project No      : IEW/CE/F070/2022-23/C976

Role                  : Principal Investigator

        Project cost     : 1,91,750/-

        Project period : 2022 (30 days)

        Status              : Completed

[11] Storm water management plan for the Natco Pharma Campus in Mekaguda

        Funded by       : Natco Pharma limited Hyderabad 

            Project No      : NPL/CE/F070/2021-22/C723

Role                  : Principal Investigator

        Project cost     : 2,76,120/-

        Project period : 2022 (15 days)

        Status              : Completed

[10] Third Party Evaluation of Polavaram Irrigation Project. 

        Funded by       : Polavaram project Authority (central Govt) 

            Project No      : PPA/CE/F070/2021-22/C609 

Role                  : Principal Investigator

        Project cost     : 22,42,000/-

        Project period : 2021 (3 months)

        Status              : Completed

[9] Investigation into the cause for water Oozing/Blister formation in the short Runway(SR), And Correction Measures. 

        Funded by       : Garrison  Engineer Project Air Force Academy Hyderabad

            Project No      : AIRFORCE/CE/F070/2020-21/C432 

Role                  : Principal Investigator

        Project cost     : 9,20,400/-

        Project period : 2020 (30 Days)

        Status              : Completed

[8] Study on Surface-Ground Water interaction to Develop a Comprehensive Hydrogeological Framework to Mange Groundwater Resource in an Over Exploited Ground Water assessment Unit.

        Funded by       : Ground Water Department, (TSGWD) 

            Project No      : TSGWD/CE/F070/2019-20/C256

Role                  : Principal Investigator

        Project cost     : 20,00,000/-

        Project period : 2019

        Status              : Ongoing

[7] Area based development (ABD) and the proposed pilot road (R-22) of 25 km length located within the ABD of the Ujjain Smart City Project.

        Funded by       : Tata Projects Limited 

            Project No      : TPL/CE/F070/2018-19/C182

Role                  : Principal Investigator

        Project cost     : 32,42,000/-

        Project period : 2018 (6 months)

        Status              : Completed

[6] Providing technical support for the project ‘Rehabilitation and Revitalization of the Bidar Karez.

        Funded by       : Indian Heritage Cities Network Foundation (Bidar District Administration) 

            Project No      : BDA/CE/F064/2016-17/C4

Role                  : Principal Investigator

        Project cost     : 13,26,000/-

        Project period : 2016 (3 months) 

        Status              : Completed

[5] Study of Flow Measurements at Four Locations.

        Funded by       : Environment Protection Training & Research Institute

            Project No      : IC/CE/2015-16/089/EPTRI/KBVN

Role                  : Principal Investigator

        Project cost     : Rs. 1,48,850/-

        Project period : 2016  

        Status              : Completed

[4] Study and operation of Raw Water Pipe line with varying draw down levels of fore bay at pumping station 1 and its impact on the pipe line.

        Funded by       : KSK Water Infrastructures Private limited 

            Project No      :  IC/CE/2015-16/079/KSK/TS

Role                  : Co- Principal Investigator

        Project cost     : Rs. 4,10,000/-

        Project period : 2015 

        Status              : Completed

[3] Study and operation of Raw Water Pipe line with varying draw down levels of fore bay at pumping station 1 and its impact on the pipe line.

        Funded by       : KSK Water Infrastructures Pvt Ltd

            Project No      : IC/CE/2014-15/62/KSK/TS-KBVN 

Role                  : Co- Principal Investigator

        Project cost     : Rs. 10,95,510/- 

        Project period : 2014 (4 months)

        Status              : Completed

[2] Intermediate Reservoir (IR) Dam Break Analysis, Flood Routing and Third Party Inspection.

Funded by       : KSK Water Infrastructures Pvt Ltd

            Project No      : IC/CE/2013-14/047/KSK/IITH/KBVN 

Role                  : Principal Investigator

        Project cost     : Rs. 26,29,224/- 

        Project period : 2014 (4 months)

        Status              : Completed

[1] Digital Hydro-Geologic, Groundwater Quality Modeling and Technical Support to SuGWM Project actions.  

        Funded by       : Center for World Solidarity (CWS), Secunderabad 

            Project No      : IC/CE/2012-13/015/IITH/KBVNP 

Role                  : Principal Investigator

        Project cost     : Rs. 18,00,000/- 

        Project period : 2012 (2 Years)

        Status              : Completed