Method statements and risk assessments are live documents which will be revised and change. You should familiarise yourself with changes from time-to-time.
Risk Assessments and method statements are to be used as part of a modular system. Users should be careful to study document cross references detailed on page 1 of each where links have been provided. Documents will remain controlled until printed.
Risk assessments of each of the method statements are accessed via document cross references detailed on page 1.
Where you see this sign in a method statement, it can be used to report a problem. Simply hover over and follow the link.
Title:
Operational Risk Assessment Customer Leakage
RA005 Potable Water Mains Flushing
RA008 Mains Repair - Repair Clamp
RA010 Fire Hydrant Installation
RA012 Sluice Valve Installation
RA013 Cut & Cap of services and mains to locate leaks
RA019 Excavation, Debris Clearance, Chamber Construction & Reinstatement
RA021 Use & Disposal of Chlorine Solution
RA025 Fire Hydrant Replacement
RA027 Excavation in Asbestos Contaminated Land
RA028 Hot Works, Welding, Brazing
RA031 Disconnection of Services and Mains
RS033 Repair of Asbestos Cement Pipes
RA034 Vegetation Clearance - Hedge Trimmer
RA062 Environmental Risk Assessment
RA067 Telemetry Bollard Installation
RA068 Installation of Meters into Boundary Boxes
RA070 Welfare at transient work sites - Up to 5 days
RA071 Working on or adjacent to the public highway, including set up of TM
RA079 Use of LPG Gas burners for line marking
RA081 Surveying Internal and External Customers Properties
RA084 Use and Storage of Hygiene Pipe and Fittings
RA085 Movement of Plant & Vehicles
RA086 Air Valve Locating Surveying & Maintenance
RA087 Tracer Gas Leak Detection
RA088 Work Adjacent to Overhead Power Lines
Title:
MS005 Potable Water Mains Flushing
MS008 Mains Repair - Repair Clamp
MS010 Fire Hydrant Installation
MS012 Sluice Valve Installation
MS013 Cut & Cap of services and mains to locate leaks
MS019 Excavation, Debris Clearance, Chamber Construction & Reinstatement
MS025 Fire Hydrant Replacement
MS027 Excavation in Asbestos Contaminated Land
MS028 Hot Works, Welding, Brazing
MS031 Disconnection of Service and Mains
MS032 Pumping Out Dewatering Excavations
MS033 Repair of Asbestos Cement Pipes
MS066 Impact Moling/Thrust Boring
MS067 Telemetry Board Installation
MS068 Installation of Meters in Boundary Boxes
MS084 Storage of Hygienic Pipe and Fitting
MS086 Air Valve Locating Surveying & Maintenance
MS087 Tracer Gas Leak Detection