Assuming the farm has xx number of animals
- Please provide volumes of dairy washing soiled water (including all soiled yards) slurry and farmyard manure, produced on site during the 16 week storage period.
- Dimensions and gross capacities for all slurry, farmyard manure and soiled water storage tanks on site. These calculations shall include provisions for rainfall (in the case of open tanks) and freeboard as per S.I. No. 31 of 2014.
- Provide calculation to show that the application of nitrogen from the proposed facility does not exceed 170kg/ha/year.
- Using the farm map identity lands suitable for spreading of slurry and clearly mark all buffer zones.