Join WA Community >>>
The Circle Line MRT3 is an orbital rail line, designed to connect the existing Klang Valley public transport network and improve mobility and ease of travel for the city’s growing population. Spanning 51 kilometers around the city’s perimeter, the Circle Line MRT3 is designed to integrate with existing MRT, LRT, KTM, and Monorail lines through 10 strategically located interchange and connecting stations.
The Circle Line MRT3 will offer shorter alternative routes to key destinations through multiple integration points along the alignment while providing critical connectivity to underserved areas of the city.
Here’s the list of MRT 3 line stations:
Bukit Kiara South (Interchange with new station on Kajang Line)
Bukit Kiara (Provisional)
Sri Hartamas
Mont Kiara
Bukit Segambut
Taman Sri Sinar
Dutamas
Jalan Kuching (Interchange with Port Klang Line)
Titiwangsa (Interchange with Ampang & Sri Petaling Line, KL Monorail and Putrajaya Line)
Kampung Puah
Jalan Langkawi
Danau Kota
Setapak
Rejang
Setiawanga (Interchange with Kelana Line)
AU2
Taman Hillview
Tasik Ampang
Kampung Pandan
Pandan Indah (Interchange with Ampang Line)
Taman Kencana
Taman Cheras
Taman Midah (Interchange with Kajang Line)
Jalan Yaacob Latif
Sri Permaisuri
Salak Selatan (Interchange with Sri Petaling Line)
Salak Jaya (Provisional)
Kuchai (Interchange with Putrajaya Line)
Jalan Klang Lama
Pantai Dalam (Interchange with Port Klang Line)
Pantai Permai
Universiti (Interchange with Kelana Jaya Line)
UM
Most of the stations are elevated except for seven that will be underground. The current planned underground stations are UM, Sri Hartamas, Mont Kiara, Bukit Segambut, Taman Sri Sinar, Dutamas and Jalan Kuching. Park and ride facilities will be provided at 15 stations.
📲 Want Us to Check a Property for You?
Before you buy — let us run a FREE Risk Report.
We’ll tell you if it’s safe, high risk, or worth it.
✅ Book Zoom Session
✅ Request Report
✅ Get Real Data
💬 PM “RISK CHECK” now to start.
Grande A+ projects showcase
HOT PICKS