Process of setting out structures, purposes, general procedure, concept and related calculation of setting out (ES)
Process of setting out and checking on the existing structure (BLS)
LESSON OBJECTIVE
5.1 Explain the process of setting out structures.
5.1.1 List the purpose of setting out work in construction
5.1.2 Explain the general procedure to execute setting out process;
a. Horizontal control
b. Vertical control
5.2 Explain setting out grades for building basement and pipe lines
5.2.1 Identify the concept and related calculation of setting out by using:
a. Sight Rails
b. Slope Rails
c. Travelers rods
5.3 Organize the setting out field work according to standard procedure and method.
5.3.1 Measure the setting out point for:
a. Building Basement
b. Pipe lines
LESSON OBJECTIVE
5.1 Explain process of setting out structures
5.1.1 Describe purpose of setting out work in construction
5.1.2 Recognize general procedure to execute setting out process horizontal control and vertical control
5.1.3 Illustrate and calculate matters related to the use as well as marking of level rail, rod level, inclined rail and
traveler’s rod
5.1.4 Explain how to conduct setting out for a building’s basement
5.1.5 Explain procedures of pipe laying
5.2 Explain checking on the existing structure for trench, drain and pipe
5.2.1 Follows the standard procedure for checking on existing structure of trench, drain and pipe
5.2.2 Perform the field work according the above requirement