Q: How much space does an Electrobanc Project need?
A: Typically, 30,000sf-multiple acres (building or land)
Q: How long does a Electrobanc Project take to develop?
A: Typically, 2-3 years.
Q: What zoning is needed?
A: Industrial, Manufacturing, Agricultural, Rural Residential are preferred
Q: Lease or Buy?
A: We would prefer to lease land and or buildings, but we are open to other structures on a case-by-case basis.
Q: Does Electrobanc need to use the property during the development process?
A: No, we will make visits, but we will not need use of the property during the development.
Q: Are there any hazardous materials being brought on site?
A: No, there are no materials that can leak, or otherwise contaminate the site.
Q: Are there any concerns with permitting for this type of application?
A: No, we work closely with county and local offices to insure a successful project.
Q: What kind of construction goes into an energy storage site?
A: Typically, we will pour a concrete pad to support the equipment for outdoor installations. For indoor sites, modifications can include enlarging bay doors, minimizing office space, and ensuring that HVAC and Fire Doors are up to code per our use.
Q: Is there any water runoff or similar flood/drainage issues that these sites create?
A: No, this is a carefully managed piece of our developments. We work closely with Federal, State, and local offices to maintain best practices.
Q: Do battery systems represent a fire hazard?
A: No, the systems operate internal fire and overheating suppression systems.
Q: What does a battery storage project look like?
A: See Below (specifics of the site may engage landscaping, or other visual impact mitigation elements)
Q: Who will be backing the lease for the term
A: We work with several institutionally rated companies who will own the lease and the system.